CN1280521C - 对地下井地层进行酸化增产的方法和设备 - Google Patents
对地下井地层进行酸化增产的方法和设备 Download PDFInfo
- Publication number
- CN1280521C CN1280521C CN02143247.3A CN02143247A CN1280521C CN 1280521 C CN1280521 C CN 1280521C CN 02143247 A CN02143247 A CN 02143247A CN 1280521 C CN1280521 C CN 1280521C
- Authority
- CN
- China
- Prior art keywords
- stratum
- mixture
- pressure
- crack
- annular space
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002253 acid Substances 0.000 title claims abstract description 20
- 239000012530 fluid Substances 0.000 claims abstract description 66
- 239000000203 mixture Substances 0.000 claims abstract description 48
- 230000000638 stimulation Effects 0.000 claims abstract description 46
- 238000000034 method Methods 0.000 claims abstract description 34
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 23
- 239000006260 foam Substances 0.000 claims abstract description 21
- 239000007788 liquid Substances 0.000 claims description 7
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 230000004044 response Effects 0.000 claims description 4
- 238000002347 injection Methods 0.000 claims 1
- 239000007924 injection Substances 0.000 claims 1
- 230000004936 stimulating effect Effects 0.000 abstract 1
- 238000005755 formation reaction Methods 0.000 description 10
- 239000007789 gas Substances 0.000 description 10
- 230000008569 process Effects 0.000 description 10
- 239000000126 substance Substances 0.000 description 5
- 239000004215 Carbon black (E152) Substances 0.000 description 4
- VEXZGXHMUGYJMC-UHFFFAOYSA-N Hydrochloric acid Chemical compound Cl VEXZGXHMUGYJMC-UHFFFAOYSA-N 0.000 description 4
- 229930195733 hydrocarbon Natural products 0.000 description 4
- 150000002430 hydrocarbons Chemical class 0.000 description 4
- 238000005406 washing Methods 0.000 description 4
- 238000004140 cleaning Methods 0.000 description 3
- 238000007599 discharging Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000001125 extrusion Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002706 hydrostatic effect Effects 0.000 description 2
- BDAGIHXWWSANSR-UHFFFAOYSA-N methanoic acid Natural products OC=O BDAGIHXWWSANSR-UHFFFAOYSA-N 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 238000004544 sputter deposition Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- OSWFIVFLDKOXQC-UHFFFAOYSA-N 4-(3-methoxyphenyl)aniline Chemical compound COC1=CC=CC(C=2C=CC(N)=CC=2)=C1 OSWFIVFLDKOXQC-UHFFFAOYSA-N 0.000 description 1
- QTBSBXVTEAMEQO-UHFFFAOYSA-M Acetate Chemical compound CC([O-])=O QTBSBXVTEAMEQO-UHFFFAOYSA-M 0.000 description 1
- 239000004604 Blowing Agent Substances 0.000 description 1
- 240000004859 Gamochaeta purpurea Species 0.000 description 1
- 208000037656 Respiratory Sounds Diseases 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- UQMRAFJOBWOFNS-UHFFFAOYSA-N butyl 2-(2,4-dichlorophenoxy)acetate Chemical compound CCCCOC(=O)COC1=CC=C(Cl)C=C1Cl UQMRAFJOBWOFNS-UHFFFAOYSA-N 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 238000003763 carbonization Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 235000019253 formic acid Nutrition 0.000 description 1
- 239000000499 gel Substances 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 150000007522 mineralic acids Chemical class 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 150000007524 organic acids Chemical class 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000009257 reactivity Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000005987 sulfurization reaction Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/27—Methods for stimulating production by forming crevices or fractures by use of eroding chemicals, e.g. acids
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/60—Compositions for stimulating production by acting on the underground formation
- C09K8/62—Compositions for forming crevices or fractures
- C09K8/72—Eroding chemicals, e.g. acids
- C09K8/74—Eroding chemicals, e.g. acids combined with additives added for specific purposes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/255—Methods for stimulating production including the injection of a gaseous medium as treatment fluid into the formation
Abstract
本发明涉及对井下地层进行酸化增产的方法和设备。其中包括将多个喷嘴与地层的壁成间隔关系定位,在喷嘴与地层之间形成一环空,在压力下将含酸的增产流体通过喷嘴泵压到该环空中打在地层的壁上,将一气体泵压到该环空中,使增产流体与气体混合,在将混合物喷向地层而冲击地层壁之前产生泡沫。
Description
技术领域
本发明涉及一种方法和设备,用于处理地下井地层,从而增加碳氢化合物的生产量。
背景技术
已经开发了多种技术用于处理地下井地层,从而增加碳氢化合物的生产量。例如,经常使用水力压裂方法,根据该方法,用常规封隔器等将一部分将增产的地层分离,将含有凝胶、酸、沙浆等的增产流体泵压穿过井筒进入地层的分离部分中。加压的增产流体以一非常高的力推压在地层上,从而在地层上建立和扩展裂缝。但用封隔器分离地层的要求很费时且相当大地增加了系统成本。
还使用了挤压方法,包括以一高于地层压力的压力(但没有压裂方法中流体压力那样高)将含有酸的增产流体引入碳化地层中,使流体渗入地层的孔隙中,并与地层反应而将孔隙放大。但这是个相对较慢的过程且在地层中产生的孔隙相对较小。同样,由于这些增产流体通常活性非常高,尤其是在上升的温度下,流体经常在靠近地层中的井筒时提前消耗掉。因而不能实现进一步前进,而流体进入点经常极大地放大。结果不能在整个井筒面上形成多个相对较长且有效的指进,特别是在要求深层穿透的低渗透性油藏中。
酸的化学反应性可通过多种途径降低,其中一种是使用泡沫。由于泡沫还是很好的防泄漏材料,它们有助于产生大的裂缝。常规地,起泡设备设置在地面上,产生泡沫,然后向下泵入孔中。但泡沫的磨擦系数大得多,并降低了静水效果,这两点严重提高了处理井所需压力。
发明内容
因此需要一种增产处理方法,能够结合上述类型的多数或全部特征,从而减少或消除对分离封隔器的需要,泡沫发生可在井下现场进行,穿透深度可提高,可对压裂酸与地层的反应进行控制,从而防止酸与地层的提前反应。
一方面,本发明提供一种使井下地层增产的方法,该方法包括将多个喷嘴与地层的壁成间隔关系定位,在喷嘴与地层之间形成一环空,在压力下将含酸的增产流体通过喷嘴泵压到该环空中打在地层的壁上,将一气体泵压到该环空中,使增产流体与气体混合,在将混合物喷向地层而冲击地层壁之前产生泡沫。
本发明还提供用于使井下地层增产的设备,该设备包括多个与地层的壁成间隔关系定位从而在喷嘴与地层之间形成一环空的喷嘴,用于以一预定压力将含酸的增产流体通过喷嘴引入到该环空中打在地层壁上的装置,用于将气体泵压到该环空中,使增产流体与气体混合,在将混合物喷向地层而冲击地层壁之前产生泡沫的装置,其中该混合物在地层壁中产生裂缝,以及当裂缝之间的空间注满流体时用于降低混合物的压力及环空中流体压力的装置。
附图说明
为使本发明得到更全面的理解,对附图进行参照,其中:
图1是位于垂直井筒中的根据本发明一实施例的压裂设备的剖视图。
图2是图1和2中设备两部件的分解立面图。
图3是图2中部件的剖视图。
图4是位于具有水平偏移的一井筒中的根据本发明一实施例的压裂设备的剖视图。
图5是与图1相似的视图,但示出位于一垂直井筒中的根据本发明压裂设备的一可替换实施例。
图6与图5非常类似,但示出位于具有水平偏移的一井筒中的图5中实施例的压裂设备。
具体实施方式
参照图1,示出安装在一地下垂直延伸的井筒10中的根据本发明一实施例的增产设备,井筒10穿透产生碳氢化合物的地下地层12。一套管14从地面(未图示)延伸到井筒10中并终止于该地层上方。该增产设备包括一工作管柱16,该工作管柱16为管道或盘绕管形式,并从地面延伸穿过套管14。如从图1中看到的,工作管柱16延伸超过套管14的一端或在其下面,工作管柱16的一端以将要描述的方式与管状喷射接头20的一端联接。该喷射接头具有穿过其壁加工的多个通孔22,形成下面将详细描述的排放射流。
一阀接头26以同样将描述的方式与喷射接头20的另一端联接。如下面将详细描述的,工作管柱16位于地面的端部用于接收增产流体,阀接头26通常关闭,使增产流体流从喷射接头20排出。阀接头26是可选择的,一般要求例如在挡住、设备失效等过程中允许紧急反向循环过程。在井筒10的内表面与工作管柱16和接头20和26的外表面之间形成一环空28。
增产流体包括用于如上所述的挤压或压裂酸化的常规的酸,以及本领域中公知的各种填加剂。典型的流体包括矿物或有机酸,如盐酸,甲酸,乙酸,或它们的混合物。这种类型流体的一个更具体的但非限定性的例子是包含凝胶剂、防腐剂、铁控化学制品、用于控制硫化裂纹的化学制品的28%盐酸。另外,由于将说明的原因,可将一些沙和发泡剂加入流体中。该混合物下面称作“增产流体”。
喷射接头20和阀接头26的各轴基本上在井筒10中垂直延伸。当泵压增产流体穿过工作管柱16时,其进入喷射接头20内部,并通过孔22排放到井筒10中,打在地层12上。
图2和3中示出喷射接头20和球阀接头26的细节。该喷射接头20由一管状壳体30形成,该接头20包括一延伸穿过壳体长度的纵向流道32。孔22在一个平面中延伸穿过套管的壁,并可垂直于图2中所示套管的轴线延伸,和/或如图3所示与套管轴线成一锐角延伸,和/或与该轴线(未图示)对准。这样,来自工作管柱16的增产流体穿过通道32,从孔22排出。增产流体排放模式是绕壳体30延伸的盘的形式。
由于高压,来自壳体30内部的增产流体被压出相对较小的孔22,实现一喷射效果。这是由于增产流体以一如211.2-422.4kg/cm2(3000-6000磅/平方英寸)这样相对较高的压差排放增产流体而导致的,这将增产流体加速到一相对较高的速度,如198米/秒(650英尺/秒)。喷射入井筒10中的该高速增产流体使环绕增产流体流的压力急剧下降(基于著名的伯努利原理),这消除了对于上述隔离封隔器的需要。
在壳体30两端形成两个管状管接头34和36,并最好与壳体整体成形。管接头34和36直径小于壳体30并且是外螺纹,工作管柱16(图1)的对应端部是内螺纹,从而借助于管接头34将工作管柱紧固到壳体30上。
阀接头26由一管状壳体40制成,该壳体40包括一从壳体一端伸出的第一纵向流道42和一从流道42向壳体另一端延伸的第二纵向流道44。流道42的直径大于流道44,从而在流道之间形成一台肩,一球46在流道42中延伸并通常座靠在该台肩上。
一外螺纹管接头48从壳体(套管)40一端伸出,用于联接增产过程中使用的其它部件(未图示),如传感器,记录器,定中心器等。壳体40另一端为内螺纹,用于接收喷射接头20的外螺纹管接头36,从而将阀接头26的壳体40联接到喷射接头的壳体30上。
可以理解,其它常规部件,如对中装置,BOPS,脱模机,管路阀,固定器等,可以连接到图1中的系统上。由于这些部件是常规的,不构成本发明的任何部分,为清楚起见,图1中作了省略。
操作中,球46落入工作管柱16中,同时增产流体连续从地面通过工作管柱16和喷射接头20泵压到阀接头26。阀接头26中,球46穿过流道42,座靠在流道42与44之间的台肩上。这样在接头20和26中建立起流体压力,使增产流体通过孔22排出。
然后增产流体的泵压速度上升到一水平,因而喷射穿过孔22的增产流体的压力达到一相对较高的压差,并达到如上所述的高排放速度。
在上述操作过程中,主要包含二氧化碳和氮的气体从地面泵压到环空28中(图1)。气体流过环空28,增产流体与气体混合并将其向地层载运,导致高能混合产生泡沫,产生的混合物下面称作“混合物”。
混合物被喷向地层,并冲击构成井筒10的地层壁。受限的混合物对地层中的空腔进行加压,当每个空腔变得足够深时,地层将在压力足够高时开裂。用于混合物的通路产生在地层中腔的底部,用作进入地层的输出口,而环空28用作到达系统的输入口。从而产生一直接与裂缝联接的实际上的喷射泵。另外,每个空腔变成了一个小混合室,极大地提高了泡沫的均匀性和质量。该高质量泡沫然后被推入裂缝中,或者返回井筒区域。
如果喷射压力和环空28中的压力不足以产生裂缝,且如果组合压力高于地层中的孔隙压力,将发生“挤压”。可替换地,如果在发生上述开裂后需要挤压,则将环空28中混合物的压力降低到挤压水平压力,该压力高于地层中孔隙的压力。
在任何一种上述情况中,根据挤压过程,穿过地层中大孔隙的混合物的量大于穿过小孔隙的量,大孔隙在尺寸上将显著变大,形成混合物流过的通道或“虫孔”。混合物中泡沫的存在延迟了混合物中酸与地层的反应,因而与不使用泡沫的技术相比,提高了混合物到达地层中的程度。另外,泡沫是高质量的,提高了处理的可选择性和有效性。当以所述方式将井筒10中的混合物加压打击井筒壁和裂缝表面时,泡沫中的气泡会堵塞小的孔隙而进入大的孔隙,使混合物中的酸部分与地层材料反应,从而进一步加大了大孔隙。这样就实现了显著挤压而产生通道,也称作在裂缝表面和井筒壁中“指进”或“虫孔”,混合物与地层的反应相对较慢,因而混合物可较深地穿透到地层基岩中。在挤压结束时,当环空28压力减小时裂缝关闭,混合物回流到井筒中沿裂缝表面产生了通道或虫孔。
如上所述,如果需要产生相对较大的裂缝,则对接头20周围的环空28中的压力进行控制,使其大于挤压压力,并略小于液压压裂压力。冲击或滞留压力将使净压力显著高于所需的压裂压力;因此可以产生非常大的裂缝(如长度为7.6米(25英尺)到152米(500英尺)或更大)。该过程中,泡沫减少了混合物向裂缝表面和/或自然裂缝的损失。混合物的损失减小,大部分混合物体积可用作扩张裂缝从而产生相对较大裂缝的手段。由于压裂压力高于上述的挤压压力,混合物在裂缝面中的指进可如上所述在上述挤压操作中同时发生。
在上述操作之后,如果需要从井筒10,工作管柱16及接头20和26中清除异物,如碎石,管道涂料等,则将工作管柱16中增产流体的压力降低,将清洗流体,如水,以一相对较高的压力引入环空28中。在到达井筒10中低于接头20和26的一个深度后,该高压清洗流体与上述增产流体方向相反地流动并进入阀接头26的流道44的排放端。清洗流体的压力迫使球阀46脱离与接头26的流道42和44之间的台肩的配合。球阀46和清洗流体通过通道42、喷射接头20以及工作管柱46到达地面。清洗流体的这种循环将工作管柱16、接头20和26以及井筒10中的异物清洗出来。
当上述清洗操作完成后,如果需要增产流体开始以上述方式排放在地层壁上,则球阀46以上述方式从地面下降到工作管柱16中,如上所述将增产流体引入工作管柱16中。
图4示出一增产系统,该系统包括图1-3中系统的一些部件,并给出相同的参考数字。图4中的系统安装在一地下井筒50中,该地下井筒50具有一从地面开始延伸的基本垂直部分50a,和一从部分50a延伸到一产生碳氢化合物的地下地层52中的偏斜的基本水平部分50b。如前述实施例中那样,套管14从地面延伸到井筒50a中。
图4中的增产系统包括一工作管柱56,该工作管柱56为管道或盘绕管的形式,从地面穿过壳体14和井筒部分50a延伸进入井筒部分50b中。如前述实施例中那样,从地面(未图示)将增产流体引入工作管柱56的一端。管状喷射接头20的一端以上面所述的方式与工作管柱56的另一端联接,用于以上面所述的方式将增产流体接收和排放到井筒部分50b以及地层52中。阀接头26与喷射接头20的另一端联接,并以如上所述的方式控制增产流体流过喷射接头。喷射接头20和阀接头26的各轴基本上在井筒部分50b中水平延伸,因而当增产流体被泵压通过工作管柱56时,它进入喷射接头20内部,并沿基本上径向或角度方向穿过井筒部分50b排放在地层52上,以如上所述的方式对其进行压裂和挤压。井筒的水平或偏斜部分是完全的裸眼,本实施例的操作与图1中的相同。可以理解,尽管图4中所示的井筒部分50b基本上水平延伸,上述实施例同样可用于与水平成一角度延伸的井筒。
对于井筒在其中垂直地、水平地或成角度地延伸相对较长距离的地层,喷射接头20、阀接头26和工作管柱56可以初始地设置在井筒的下端部分(即离地面最远的部分)。上述的压裂酸化和挤压过程可以在整个水平井筒部分中重复多次,如每隔100到200英尺进行一次。可替换地,该过程可以以连续方式通过相对较慢地和持续地将工作管柱56、因而接头20移向地面而完成,使接头被拖动通过井筒中的高山和峡谷。当喷射接头20位于“高山”的顶部时,即当喷射接头几乎接触井筒内表面时,产生裂缝;当位于峡谷中时,不会产生压裂。同样,也将如上所述发生挤压。
图5中的实施例与图1中相似,使用与后一实施例中相同的部件,这些部件给出与图5中实施例相同的参考数字,设有一套管60,该套管60从地面(未图示)延伸到形成于地层12中的井筒10中。该套管60在井筒中工作管柱16及接头20和26延伸部分的整个长度上延伸。因此套管60以及接头20和26的轴线基本上垂直延伸。
在将增产流体引入喷射接头20中之前,将混有沙子的液体引入喷射接头20中,并从接头20中的孔22以一高速度排向套管60的内壁,在后面的壁上形成小孔。然后起动结合图1-3中的实施例描述的操作,设有一套管62,该套管62从地面延伸到形成于地层中的井筒10中,在井筒的整个长度上延伸,其中工作管柱16以及增产流体与泡沫气体的混合物以一相对较高的速度排放通过孔22,通过套管60中的上述孔,打击地层12,从而以如上所述的方式对其进行压裂和挤压。除此之外,图5中实施例的操作与图1-4中相同。
图6中的实施例与图4中的相似,使用许多与后一实施例中相同的部件,这些部件给出相同的参考数字。在图6的实施例中,设有一套管62,该套管62从地面(未图示)伸入形成于地层52中的井筒50中。套管62在井筒中工作管柱56和接头20、22所在的部分的整个长度上延伸。因此,套管62具有分别在井筒部分50a和50b中延伸的一基本垂直部分62a和一基本水平部分60b。接头20和26位于套管部分62b中,它们的各轴基本上水平延伸。
在将增产液体引入喷射接头20之前,将混有沙子的液体引入球阀46(图3)到位的工作管柱16中。液体/沙混合物从喷射接头20中的孔22(图2)以一非常高的速度排放到套管62的内壁上,穿过后壁形成小孔。然后起动上面结合图1-3中的实施例描述的增产操作,增产流体与泡沫气体的混合物以一相对较高的速度穿过孔22和套管62中的上述孔,排放在地层52的壁上,以如上所述的方式对其进行冲击。除此之外,图6中实施例的操作与图1-3中相同。
可以理解,可在不脱离本发明范围的前提下在前述实施例中作各种变化。例如,由于许多原因,如降低成本和提高静水压力,可在进入套管14之前将在环空28中流动的气体预先混合一些液体。另外,井筒的特殊定向可以从完全垂直转换到完全水平。另外,排放孔相对于喷射接头轴线的特殊角度可以改变。此外,接头20中的孔22可用单独安装的由稀有材料如硬质合金混合物制成的喷嘴代替,用于提高耐久性。同样,环空28中可使用多种其它流体,包括清洗增产流体,化学控制粘土稳定性的液体,以及普通低成本流体。
虽然上面详细描述了本发明的一些示例性实施例,但本领域技术人员很容易明白,在不实质上脱离本发明的新颖的教导和优点的前提下,可进行多种其它修改。因此,所有这些修改都包括在由下面限定的本发明的范围内。在如下保护范围中,装置加功能的条款用于覆盖此处描述的实现所述功能的结构,不仅包括结构等同物,而且包括等同结构。
Claims (18)
1.一种使井下地层增产的方法,该方法包括将多个喷嘴与地层的壁成间隔关系定位,在喷嘴与地层之间形成一环空,在压力下将含酸的增产流体通过喷嘴泵压到该环空中打在地层的壁上,将一气体泵压到该环空中,使增产流体与气体混合,在将混合物喷向地层而冲击地层壁之前产生泡沫。
2.根据权利要求1所述的方法,其特征在于,混合物中的酸与地层反应而在地层壁中形成通道。
3.根据权利要求1或2所述的方法,其特征在于,混合物中的泡沫延迟混合物中的酸与地层的反应。
4.根据权利要求3所述的方法,其特征在于,酸反应的延迟使通道扩展。
5.根据权利要求1或2所述的方法,其特征在于,压力足以形成裂缝。
6.根据权利要求5所述的方法,其特征在于,迫使混合物进入裂缝中,以进一步扩展裂缝。
7.根据权利要求5所述的方法,其特征在于,混合物中的酸与地层反应而在裂缝面上形成通道。
8.根据权利要求或2所述的方法,其特征在于,还包括将压力降低到一位于压裂压力与地层中孔隙处压力之间的值。
9.根据权利要求8所述的方法,其特征在于,喷射的混合物流到地层壁上。
10.根据权利要求1或2所述的方法,其特征在于,还包括降低混合物的压力以及环空中的液体压力,以允许裂缝关闭。
11.根据权利要求10所述的方法,其特征在于,在裂缝关闭后,混合物从裂缝中流出,在裂缝壁中形成通道。
12.根据权利要求1或2所述的方法,其特征在于,压力不足以形成裂缝,且迫使混合物进入地层的孔隙中。
13.根据权利要求1或2所述的方法,其特征在于,首先在地层中形成一井筒,该井筒具有一垂直部分和一水平部分。
14.根据权利要求13所述的方法,其特征在于,定位喷嘴的步骤包括将喷嘴连接到一工作管柱上,将该工作管柱插入井筒中。
15.根据权利要求14所述的方法,其特征在于,还包括在定位喷嘴的步骤之前,将一套管插入地层中,泵压一液体/沙混合物穿过喷嘴,从而在泵压步骤之前穿透套管。
16.一种用于使井下地层增产的设备,该设备包括多个与地层的壁成间隔关系定位从而在喷嘴与地层之间形成一环空的喷嘴,用于以一预定压力将含酸的增产流体通过喷嘴引入到该环空中打在地层壁上的装置,用于将气体泵压到该环空中而使增产流体与气体混合以便在将混合物喷向地层并冲击地层壁之前产生泡沫的装置,其中该混合物在地层壁中产生裂缝,以及还包括当裂缝之间的空间注满流体时用于降低混合物的压力及环空中流体压力的装置。
17.根据权利要求16所述的设备,其特征在于,喷嘴设置成沿基本上径向方向将流体导向地层壁。
18.根据权利要求16或17所述的设备,其特征在于,还包括用于进一步降低混合物的压力以及环空中的液体压力,以允许裂缝关闭的装置。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/966,129 | 2001-09-28 | ||
US09/966,129 US6719054B2 (en) | 2001-09-28 | 2001-09-28 | Method for acid stimulating a subterranean well formation for improving hydrocarbon production |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1425846A CN1425846A (zh) | 2003-06-25 |
CN1280521C true CN1280521C (zh) | 2006-10-18 |
Family
ID=25510948
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN02143247.3A Expired - Fee Related CN1280521C (zh) | 2001-09-28 | 2002-09-24 | 对地下井地层进行酸化增产的方法和设备 |
Country Status (9)
Country | Link |
---|---|
US (1) | US6719054B2 (zh) |
EP (1) | EP1298281B1 (zh) |
CN (1) | CN1280521C (zh) |
BR (1) | BR0203937B1 (zh) |
CA (1) | CA2405391C (zh) |
DE (1) | DE60227224D1 (zh) |
DK (1) | DK1298281T3 (zh) |
MX (1) | MXPA02009368A (zh) |
NO (1) | NO328819B1 (zh) |
Families Citing this family (74)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6725933B2 (en) * | 2001-09-28 | 2004-04-27 | Halliburton Energy Services, Inc. | Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production |
US7387165B2 (en) | 2004-12-14 | 2008-06-17 | Schlumberger Technology Corporation | System for completing multiple well intervals |
US8505632B2 (en) | 2004-12-14 | 2013-08-13 | Schlumberger Technology Corporation | Method and apparatus for deploying and using self-locating downhole devices |
US7322417B2 (en) * | 2004-12-14 | 2008-01-29 | Schlumberger Technology Corporation | Technique and apparatus for completing multiple zones |
US20090084553A1 (en) * | 2004-12-14 | 2009-04-02 | Schlumberger Technology Corporation | Sliding sleeve valve assembly with sand screen |
US8151874B2 (en) | 2006-02-27 | 2012-04-10 | Halliburton Energy Services, Inc. | Thermal recovery of shallow bitumen through increased permeability inclusions |
US7540326B2 (en) * | 2006-03-30 | 2009-06-02 | Schlumberger Technology Corporation | System and method for well treatment and perforating operations |
US7866396B2 (en) * | 2006-06-06 | 2011-01-11 | Schlumberger Technology Corporation | Systems and methods for completing a multiple zone well |
US7571766B2 (en) * | 2006-09-29 | 2009-08-11 | Halliburton Energy Services, Inc. | Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage |
US7814978B2 (en) | 2006-12-14 | 2010-10-19 | Halliburton Energy Services, Inc. | Casing expansion and formation compression for permeability plane orientation |
US8490698B2 (en) * | 2007-07-25 | 2013-07-23 | Schlumberger Technology Corporation | High solids content methods and slurries |
US9040468B2 (en) | 2007-07-25 | 2015-05-26 | Schlumberger Technology Corporation | Hydrolyzable particle compositions, treatment fluids and methods |
US8490699B2 (en) * | 2007-07-25 | 2013-07-23 | Schlumberger Technology Corporation | High solids content slurry methods |
US9080440B2 (en) | 2007-07-25 | 2015-07-14 | Schlumberger Technology Corporation | Proppant pillar placement in a fracture with high solid content fluid |
US10011763B2 (en) | 2007-07-25 | 2018-07-03 | Schlumberger Technology Corporation | Methods to deliver fluids on a well site with variable solids concentration from solid slurries |
US8936082B2 (en) | 2007-07-25 | 2015-01-20 | Schlumberger Technology Corporation | High solids content slurry systems and methods |
US7647966B2 (en) * | 2007-08-01 | 2010-01-19 | Halliburton Energy Services, Inc. | Method for drainage of heavy oil reservoir via horizontal wellbore |
US7640982B2 (en) * | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Method of injection plane initiation in a well |
US7640975B2 (en) * | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Flow control for increased permeability planes in unconsolidated formations |
US7673673B2 (en) * | 2007-08-03 | 2010-03-09 | Halliburton Energy Services, Inc. | Apparatus for isolating a jet forming aperture in a well bore servicing tool |
US7849924B2 (en) * | 2007-11-27 | 2010-12-14 | Halliburton Energy Services Inc. | Method and apparatus for moving a high pressure fluid aperture in a well bore servicing tool |
US7832477B2 (en) | 2007-12-28 | 2010-11-16 | Halliburton Energy Services, Inc. | Casing deformation and control for inclusion propagation |
WO2009103038A1 (en) * | 2008-02-14 | 2009-08-20 | David Randolph Smith | Method and apparatus to treat well stimulation fluids in-situ |
US7644761B1 (en) | 2008-07-14 | 2010-01-12 | Schlumberger Technology Corporation | Fracturing method for subterranean reservoirs |
US8960292B2 (en) * | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
GB0817501D0 (en) * | 2008-09-24 | 2008-10-29 | Minova Int Ltd | Method of stabilising a blasthole |
US7775285B2 (en) * | 2008-11-19 | 2010-08-17 | Halliburton Energy Services, Inc. | Apparatus and method for servicing a wellbore |
US8631872B2 (en) * | 2009-09-24 | 2014-01-21 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
US8887803B2 (en) | 2012-04-09 | 2014-11-18 | Halliburton Energy Services, Inc. | Multi-interval wellbore treatment method |
US9016376B2 (en) | 2012-08-06 | 2015-04-28 | Halliburton Energy Services, Inc. | Method and wellbore servicing apparatus for production completion of an oil and gas well |
US9796918B2 (en) | 2013-01-30 | 2017-10-24 | Halliburton Energy Services, Inc. | Wellbore servicing fluids and methods of making and using same |
US8695710B2 (en) | 2011-02-10 | 2014-04-15 | Halliburton Energy Services, Inc. | Method for individually servicing a plurality of zones of a subterranean formation |
US8276675B2 (en) * | 2009-08-11 | 2012-10-02 | Halliburton Energy Services Inc. | System and method for servicing a wellbore |
US8668012B2 (en) | 2011-02-10 | 2014-03-11 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US8668016B2 (en) | 2009-08-11 | 2014-03-11 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US20110061869A1 (en) * | 2009-09-14 | 2011-03-17 | Halliburton Energy Services, Inc. | Formation of Fractures Within Horizontal Well |
US8104539B2 (en) * | 2009-10-21 | 2012-01-31 | Halliburton Energy Services Inc. | Bottom hole assembly for subterranean operations |
US8272443B2 (en) * | 2009-11-12 | 2012-09-25 | Halliburton Energy Services Inc. | Downhole progressive pressurization actuated tool and method of using the same |
CA2999324C (en) * | 2010-02-18 | 2020-09-22 | Ncs Multistage Inc. | Downhole tool assembly with debris relief, and method for using same |
US8662172B2 (en) | 2010-04-12 | 2014-03-04 | Schlumberger Technology Corporation | Methods to gravel pack a well using expanding materials |
US8365827B2 (en) | 2010-06-16 | 2013-02-05 | Baker Hughes Incorporated | Fracturing method to reduce tortuosity |
US8505628B2 (en) | 2010-06-30 | 2013-08-13 | Schlumberger Technology Corporation | High solids content slurries, systems and methods |
US8511381B2 (en) | 2010-06-30 | 2013-08-20 | Schlumberger Technology Corporation | High solids content slurry methods and systems |
US8607870B2 (en) | 2010-11-19 | 2013-12-17 | Schlumberger Technology Corporation | Methods to create high conductivity fractures that connect hydraulic fracture networks in a well |
US8733443B2 (en) | 2010-12-21 | 2014-05-27 | Saudi Arabian Oil Company | Inducing flowback of damaging mud-induced materials and debris to improve acid stimulation of long horizontal injection wells in tight carbonate formations |
US8939202B2 (en) | 2011-05-24 | 2015-01-27 | Baker Hughes Incorporated | Fracturing nozzle assembly with cyclic stress capability |
US8720544B2 (en) | 2011-05-24 | 2014-05-13 | Baker Hughes Incorporated | Enhanced penetration of telescoping fracturing nozzle assembly |
US9227204B2 (en) | 2011-06-01 | 2016-01-05 | Halliburton Energy Services, Inc. | Hydrajetting nozzle and method |
US9133387B2 (en) | 2011-06-06 | 2015-09-15 | Schlumberger Technology Corporation | Methods to improve stability of high solid content fluid |
US8893811B2 (en) | 2011-06-08 | 2014-11-25 | Halliburton Energy Services, Inc. | Responsively activated wellbore stimulation assemblies and methods of using the same |
US8899334B2 (en) | 2011-08-23 | 2014-12-02 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US8955585B2 (en) | 2011-09-27 | 2015-02-17 | Halliburton Energy Services, Inc. | Forming inclusions in selected azimuthal orientations from a casing section |
US8662178B2 (en) | 2011-09-29 | 2014-03-04 | Halliburton Energy Services, Inc. | Responsively activated wellbore stimulation assemblies and methods of using the same |
US9238953B2 (en) | 2011-11-08 | 2016-01-19 | Schlumberger Technology Corporation | Completion method for stimulation of multiple intervals |
US9863228B2 (en) | 2012-03-08 | 2018-01-09 | Schlumberger Technology Corporation | System and method for delivering treatment fluid |
US9803457B2 (en) | 2012-03-08 | 2017-10-31 | Schlumberger Technology Corporation | System and method for delivering treatment fluid |
US8991509B2 (en) | 2012-04-30 | 2015-03-31 | Halliburton Energy Services, Inc. | Delayed activation activatable stimulation assembly |
US9650851B2 (en) | 2012-06-18 | 2017-05-16 | Schlumberger Technology Corporation | Autonomous untethered well object |
US9784070B2 (en) | 2012-06-29 | 2017-10-10 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
CN103806882B (zh) * | 2012-11-02 | 2016-09-28 | 景丽百合 | 一种气举采液方法及装置 |
US9528354B2 (en) | 2012-11-14 | 2016-12-27 | Schlumberger Technology Corporation | Downhole tool positioning system and method |
US9388335B2 (en) | 2013-07-25 | 2016-07-12 | Schlumberger Technology Corporation | Pickering emulsion treatment fluid |
US9631468B2 (en) | 2013-09-03 | 2017-04-25 | Schlumberger Technology Corporation | Well treatment |
WO2015156757A1 (en) | 2014-04-07 | 2015-10-15 | Halliburton Energy Services, Inc. | Soil and rock grouting using a hydrajetting tool |
US11015417B2 (en) | 2014-04-07 | 2021-05-25 | Halliburton Energy Services, Inc. | Using cement slurries in hydrajetting tools |
WO2016209214A1 (en) | 2015-06-23 | 2016-12-29 | Halliburton Energy Services, Inc. | Jetting apparatus for fracturing applications |
AU2016317746B2 (en) | 2015-08-31 | 2019-05-09 | Shell Internationale Research Maatschappij B.V. | Weighted acid compositions comprising aminio acids |
WO2017082916A1 (en) * | 2015-11-12 | 2017-05-18 | Halliburton Energy Services, Inc. | Method for fracturing a formation |
WO2017123217A1 (en) * | 2016-01-13 | 2017-07-20 | Halliburton Energy Services, Inc. | High-pressure jetting and data communication during subterranean perforation operations |
US10100245B1 (en) * | 2017-05-15 | 2018-10-16 | Saudi Arabian Oil Company | Enhancing acid fracture conductivity |
CA3008735A1 (en) | 2017-06-19 | 2018-12-19 | Nuwave Industries Inc. | Waterjet cutting tool |
WO2019013855A1 (en) | 2017-07-10 | 2019-01-17 | Exxonmobil Upstream Research Company | METHODS OF STIMULATING DEEP RESERVOIR USING ACID-FORMING FLUIDS |
US11867012B2 (en) | 2021-12-06 | 2024-01-09 | Saudi Arabian Oil Company | Gauge cutter and sampler apparatus |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2802537A (en) | 1954-11-04 | 1957-08-13 | Robert G Goldinger | Apparatus for acidizing wells |
US4044833A (en) | 1976-06-08 | 1977-08-30 | Phillips Petroleum Company | Acid foam fracturing |
US4453597A (en) | 1982-02-16 | 1984-06-12 | Fmc Corporation | Stimulation of hydrocarbon flow from a geological formation |
US4480696A (en) * | 1982-10-25 | 1984-11-06 | Halliburton Company | Fracturing method for stimulation of wells utilizing carbon dioxide based fluids |
US4730676A (en) | 1982-12-06 | 1988-03-15 | Halliburton Company | Downhole foam generator |
US4453596A (en) | 1983-02-14 | 1984-06-12 | Halliburton Company | Method of treating subterranean formations utilizing foamed viscous fluids |
US4554082A (en) * | 1984-01-20 | 1985-11-19 | Halliburton Company | Fracturing method for stimulation of wells utilizing carbon dioxide based fluids |
BE904055A (fr) | 1986-01-16 | 1986-05-15 | Ledent Pierre | Procede concernant l'amelioration du conditionnement des agents gazeifiants utilises dans les procedes de gazeification souterraine du charbon. |
US5203724A (en) * | 1991-11-05 | 1993-04-20 | Amp Incorporated | Firewall terminal block |
US5361856A (en) | 1992-09-29 | 1994-11-08 | Halliburton Company | Well jetting apparatus and met of modifying a well therewith |
US5335724A (en) * | 1993-07-28 | 1994-08-09 | Halliburton Company | Directionally oriented slotting method |
US5392859A (en) * | 1993-12-02 | 1995-02-28 | Shell Oil Company | Acid stimulation process for production from subterranean formations |
US5499678A (en) | 1994-08-02 | 1996-03-19 | Halliburton Company | Coplanar angular jetting head for well perforating |
US5765642A (en) | 1996-12-23 | 1998-06-16 | Halliburton Energy Services, Inc. | Subterranean formation fracturing methods |
US6439310B1 (en) | 2000-09-15 | 2002-08-27 | Scott, Iii George L. | Real-time reservoir fracturing process |
-
2001
- 2001-09-28 US US09/966,129 patent/US6719054B2/en not_active Expired - Lifetime
-
2002
- 2002-09-05 DK DK02256174T patent/DK1298281T3/da active
- 2002-09-05 EP EP02256174A patent/EP1298281B1/en not_active Expired - Fee Related
- 2002-09-05 DE DE60227224T patent/DE60227224D1/de not_active Expired - Lifetime
- 2002-09-09 NO NO20024284A patent/NO328819B1/no not_active IP Right Cessation
- 2002-09-24 CN CN02143247.3A patent/CN1280521C/zh not_active Expired - Fee Related
- 2002-09-25 MX MXPA02009368A patent/MXPA02009368A/es active IP Right Grant
- 2002-09-26 BR BRPI0203937-0A patent/BR0203937B1/pt not_active IP Right Cessation
- 2002-09-27 CA CA002405391A patent/CA2405391C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
US20030062166A1 (en) | 2003-04-03 |
CA2405391A1 (en) | 2003-03-28 |
CN1425846A (zh) | 2003-06-25 |
MXPA02009368A (es) | 2004-08-12 |
CA2405391C (en) | 2008-01-15 |
EP1298281A1 (en) | 2003-04-02 |
DK1298281T3 (da) | 2008-10-20 |
US6719054B2 (en) | 2004-04-13 |
DE60227224D1 (de) | 2008-08-07 |
NO20024284L (no) | 2003-03-31 |
EP1298281B1 (en) | 2008-06-25 |
BR0203937A (pt) | 2003-09-16 |
BR0203937B1 (pt) | 2012-11-27 |
NO20024284D0 (no) | 2002-09-09 |
NO328819B1 (no) | 2010-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1280521C (zh) | 对地下井地层进行酸化增产的方法和设备 | |
CN100482918C (zh) | 对地下井地层进行酸化的方法和设备 | |
CN1327107C (zh) | 对地下井结构层进行压裂的方法和设备 | |
US6938690B2 (en) | Downhole tool and method for fracturing a subterranean well formation | |
CA2225571C (en) | Subterranean formation fracturing methods | |
CN101059070A (zh) | 一种射孔、压裂一体化的方法及其工艺管柱 | |
CN102926730A (zh) | 支撑管跟进气液喷射钻进径向井煤层气开采方法 | |
RU2078200C1 (ru) | Способ разработки нефтяного пласта | |
CN111577234A (zh) | 脉冲水平井体积压裂装置和水平井体积压裂方法 | |
CN201367892Y (zh) | 油气井井下水力喷射压裂酸化工具管柱结构 | |
CN104033138A (zh) | 稠油油藏不动管柱注汽波动-化学解堵一体化装置及方法 | |
RU68052U1 (ru) | Скважинный гидравлический вибратор | |
CN103821490A (zh) | 可多级水力喷射分段压裂的专用喷射器 | |
CN104153744B (zh) | 孔隙型地热井喷射洗井器及利用该洗井器喷射洗井的方法 | |
US20150144341A1 (en) | System and Method for Forming Cavities | |
CN101942967A (zh) | 减压提速的钻头水力结构和钻头 | |
RU2612413C1 (ru) | Способ обработки ствола скважины | |
RU2740505C1 (ru) | Способ кислотной обработки открытого горизонтального ствола скважин | |
RU2205950C1 (ru) | Способ обработки продуктивного карбонатного пласта | |
CN101942968A (zh) | 一种减压提速的钻头 | |
CN202250016U (zh) | 水力喷射分段压裂工具 | |
RU2342518C1 (ru) | Способ промывки песчаной пробки и предотвращения пескообразования в обводняющейся скважине | |
SU1193268A1 (ru) | Способ изол ции поглощающих пластов | |
RU2464410C1 (ru) | Способ крепления призабойной зоны пласта с неустойчивыми породами | |
RU2095542C1 (ru) | Способ изоляции пластов в скважине |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20061018 Termination date: 20160924 |
|
CF01 | Termination of patent right due to non-payment of annual fee |