US20110061869A1 - Formation of Fractures Within Horizontal Well - Google Patents
Formation of Fractures Within Horizontal Well Download PDFInfo
- Publication number
- US20110061869A1 US20110061869A1 US12/558,747 US55874709A US2011061869A1 US 20110061869 A1 US20110061869 A1 US 20110061869A1 US 55874709 A US55874709 A US 55874709A US 2011061869 A1 US2011061869 A1 US 2011061869A1
- Authority
- US
- United States
- Prior art keywords
- tunnel
- horizontal wellbore
- forming
- extending
- subterranean zone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000015572 biosynthetic process Effects 0.000 title claims description 18
- 239000012530 fluid Substances 0.000 claims description 52
- 238000000034 method Methods 0.000 claims description 26
- 238000005553 drilling Methods 0.000 claims description 13
- 230000000694 effects Effects 0.000 claims description 7
- 230000004323 axial length Effects 0.000 claims description 4
- 230000001902 propagating effect Effects 0.000 claims description 4
- 206010017076 Fracture Diseases 0.000 description 96
- 208000010392 Bone Fractures Diseases 0.000 description 61
- 238000012360 testing method Methods 0.000 description 20
- 230000015556 catabolic process Effects 0.000 description 3
- 230000000977 initiatory effect Effects 0.000 description 3
- 230000000644 propagated effect Effects 0.000 description 3
- 230000000638 stimulation Effects 0.000 description 3
- 208000006670 Multiple fractures Diseases 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 229910052602 gypsum Inorganic materials 0.000 description 1
- 239000010440 gypsum Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well
Definitions
- This disclosure relates to forming transverse fractures into a subterranean zone from a horizontal well and more particularly to using a tunnel extending from the horizontal wellbore as a transverse fracture initiation location.
- Reservoir stimulation may be used to enhance recovery of reservoir fluids from a subterranean reservoir or zone.
- An example reservoir stimulation is hydraulic fracturing (interchangeably referred to as “fracturing”) in which fluid is pumped into a wellbore at an elevated pressure to form one or more fractures in the subterranean reservoir bordering the wellbore.
- the fractures formed during fracturing provide flow conduits emanating from the wellbore, providing flowpaths for the reservoir fluid to collect in the wellbore and subsequently be produced to the surface.
- One aspect of the present disclosure is directed to a method of forming transverse fractures extending from a horizontal wellbore.
- the method may include forming a wellbore having a horizontal wellbore portion within a subterranean zone and forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden.
- the tunnel may be formed with a length adapted to initiate a fracturing extending from the tunnel along a longitudinal axis thereof being influenced insignificantly by the horizontal wellbore portion.
- the method may also include applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form a fracture extending from the tunnel along a longitudinal axis thereof and propagating the initiated fracture to encompass the horizontal wellbore portion.
- a second aspect is directed to a wellbore system including a horizontal wellbore extending through a subterranean zone and at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden.
- the at least one tunnel may have a length adapted to form transverse fractures relative to the horizontal wellbore.
- a third aspect is directed to a method of forming fractures transverse to a horizontal wellbore including forming a wellbore having a horizontal wellbore portion within a subterranean zone and forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden.
- the tunnel may be formed with a length such that the horizontal wellbore portion has insignificant effects on formation of a fracture extending from the tunnel along a longitudinal axis thereof
- the method may also include applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form the fracture extending from the tunnel along the longitudinal axis thereof and propagating the initiated fracture to encompass the horizontal wellbore portion.
- Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with one of a hydrajet, a laser, or a drilling tool.
- Forming the tunnel with a hydrajet may include disposing a hydrajet into the horizontal wellbore portion at a desired location therein, orienting the hydrajet to form the tunnel, and operating the hydrajet to impinge a fluid flow onto a surface of the horizontal wellbore portion to form the tunnel.
- Forming the tunnel with a laser may include disposing a laser into the substantially horizontal wellbore portion, orienting the laser to form the tunnel, and operating the laser to form the tunnel.
- Forming the tunnel with a drilling tool may include disposing a drilling tool into the substantially horizontal wellbore portion, orienting the drilling tool to form the tunnel, and operating the drilling tool to form the tunnel.
- At least a portion of the horizontal wellbore may include a slanted portion, and the tunnel may extend from the slanted portion of the horizontal wellbore.
- the at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden may include a first substantially vertical tunnel extending from a first portion of the horizontal wellbore and a second substantially vertical tunnel extending from a second portion of the horizontal wellbore along a perimeter thereof opposite the first portion.
- the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore may include a tunnel having a length of at least one and a half (1.5) times a radius of the horizontal wellbore, a tunnel having a length of at least three (3) times a radius of the horizontal wellbore, or a tunnel having a length of at least six (6) times a radius of the horizontal wellbore.
- Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion, forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion, or forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion.
- Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include inserting a tool in the horizontal wellbore portion and orienting the tool into a desired orientation to form the tunnel.
- FIG. 1 shows a wellbore extending from a terranean surface into a subterranean zone.
- FIG. 2 shows a longitudinal fracture extending from a horizontal portion of a wellbore.
- FIG. 3 shows a longitudinal fracture extending from a horizontal wellbore.
- FIG. 4 shows transverse fractures extending from a horizontal portion of a wellbore.
- FIG. 5 shows a transverse fracture extending from a horizontal wellbore.
- FIG. 6 is a view along an axis of a horizontal wellbore in which a transverse fracture extends from the horizontal wellbore.
- FIG. 7 shows a longitudinal fracture extending from a vertical wellbore.
- FIG. 8 shows a tunnel extending from a portion of a horizontal wellbore.
- FIG. 9 shows first and second tunnels extending vertically from opposite locations along a perimeter of a horizontal wellbore.
- FIG. 10 is a cross-sectional view along A-A in FIG. 8 showing a transverse fracture surrounding the horizontal wellbore that was initiated from the tunnel.
- FIG. 11 is a cross-sectional view along B-B in FIG. 9 showing a transverse fracture surrounding the horizontal wellbore that was initiated from the tunnel.
- FIGS. 12-14 illustrate the formation of a transverse fracture relative to a horizontal wellbore.
- FIG. 15 is a summary table of experimentation data.
- FIGS. 16-22 are schematic diagrams illustrating the configuration of the bores extending through various test samples.
- FIG. 1 shows a wellbore 10 having a substantially horizontal portion (hereinafter referred to as “horizontal wellbore”) 20 .
- the wellbore 10 extends from a terranean surface 30 and extends into a subterranean zone 40 .
- the subterranean zone 40 may be subjected to a fracturing operation to enhance production of the reservoir fluids.
- fracturing was performed, for example, by isolating a relatively small section of the wellbore 10 (such as with one or more packers) and injecting a fluid into the isolated section at high pressure.
- the high pressure fluid increased the stress state of the subterranean zone 40 resulting in the formation of fractures extending into the subterranean zone.
- controlling the orientation of the produced fracturing with respect to the wellbore 10 using this fracturing method was difficult, resulting in high friction pressure and sometimes creating axial fractures (also referred to herein as longitudinal fractures). In some instances, as the axially fractures propagated, the axial fractures would become re-oriented so as to be perpendicular to the minimum stress of the subterranean zone 40 .
- FIGS. 2 and 3 illustrate longitudinal fractures 50 extending longitudinally along an axis 60 of the horizontal wellbore 20 .
- Longitudinal fractures are not optimum and generally result in reduced production in comparison to transverse fractures formed in a horizontal wellbore.
- FIGS. 4-6 illustrate transverse fractures 70 formed in the subterranean zone 40 bordering the horizontal wellbore 20 . Further, longitudinal fractures are generally more likely to result when fracturing a horizontal wellbore.
- FIG. 7 illustrates longitudinal fractures 50 extending from a vertical well. This characteristic can be utilized to promote formation of transverse fractures in a horizontal well.
- one or more bores or tunnels 80 may be extended from a horizontal wellbore 20 and used to promote the formation of a transverse fracture about the horizontal wellbore 20 .
- the one or more tunnels 80 may extend towards the overburden. Generally, this means that the one or more tunnels 80 extend vertically or substantially vertically from the horizontal wellbore 20 .
- forming the one or more tunnels 80 towards the overburden is described as being formed vertical or substantially vertical. However, it is understood that the tunnels 80 may be formed in a direction other than vertical or substantially vertical in situations where the overburden is not at a location vertically offset from the horizontal wellbore 20 . Further, the one or more tunnels 80 may deviate from vertical or substantial vertical by 15°. The tunnels 80 promote the initiation and propagation of fractures that are independent of influences associated with horizontal and vertical orientations aspects of the well.
- FIG. 8 shows a single tunnel 80 extending substantially vertically from a first portion 82 of the horizontal wellbore 20
- FIG. 9 shows a pair of tunnels 80 extending from the horizontal wellbore 20
- one of the tunnels 80 extends from the first portion 82 of the horizontal wellbore 20
- the second tunnel 80 extends from a second portion 84 of the horizontal wellbore 20 , opposite the first portion 82
- both tunnels 80 are oriented vertically or substantially vertically so as to promote the formation of the transverse fracture relative to the horizontal wellbore 20 .
- the horizontal wellbore 20 may also include numerous tunnels 80 formed along the length of the horizontal wellbore 20 .
- a tunnel 80 may be included on the horizontal wellbore 20 at any location where a transverse fracture is desired.
- the number of tunnels 80 formed into the subterranean zone 40 from the horizontal wellbore 20 may be dependent upon the number of transverse fractures 70 desired. Consequently, the number of tunnels may be determined according to the design of the stimulation activity.
- FIGS. 10 and 11 show cross-sectional views of the horizontal wellbore 20 along lines A-A and B-B, respectively.
- FIGS. 10 and 11 show example transverse fractures 70 extending into the subterranean zone 40 that were initiated at the tunnels 80 .
- the tunnels 80 may be formed in any number of different ways.
- one or more of the tunnels 80 may be formed mechanically, such as by drilling into the reservoir from the horizontal wellbore 20 .
- one or more of the tunnels 80 may be formed using one or more lasers.
- a laser device may be included on a tubing string extending into the horizontal wellbore 20 and used to form the tunnels 80 therefrom.
- one or more of the tunnels 80 may be formed with a stream of pressurized fluid, e.g., by hydrajetting, which forces a concentrated jet of fluid at elevated pressures towards a point within a wellbore.
- Example hydrajets that may be used are described in U.S. Pat. No. 5,361,856 and U.S. Pat. No. 5,494,103, each of which is incorporated herein by reference in their entirety.
- a pressurized fluid is then introduced into the horizontal well 20 to form the transverse fracture 70 .
- the tunnel 80 has a better defined elongated shape with less damage to the surrounding subterranean zone 40 .
- This damage provides leak-off paths for the fracturing fluid to flow off into the subterranean zone 40 , thereby reducing the effective pressure exerted on the subterranean zone 40 to form the fractures therein, i.e., the damage to the surrounding subterranean zone 40 may cause an increase in the breakdown pressure required to fracture the subterranean zone 40 .
- a plurality of perforations are formed in the subterranean zone 40 . These multiple perforations also act to lessen the effect of the pressurized fluid, because the multiple perforations require more pressure and fluid flow.
- perforating a wellbore with a hydrajet expels a plurality of fluid streams through respective nozzles.
- the fluid streams form a plurality of openings into the subterranean formation from the wellbore.
- the effect of using the plurality of fluid streams results in enlarging the openings into an enlarged cavity formed in the subterranean zone surrounding the wellbore.
- the pressurized fluid is introduced into the wellbore for fracturing, the enlarged cavity reduces the effectiveness of concentrating the pressurized fluid to initiate and propagate a fracture in a controlled manner.
- present hydrajets for perforating a subterranean zone are also deficient in that the nozzles expelling the fluid streams are not capable of being aligned with a particular orientation within the wellbore and are, thus, incapable of aligning openings formed by the hydrajet with a desired orientation.
- the subterranean zone 40 may then be fractured.
- the pressurized fluid may be introduced into the horizontal wellbore 20 via a concentrated stream at or near the location of the tunnel(s) 80 .
- a portion of the horizontal wellbore 20 including the tunnel(s) 80 is isolated according to any desired manner, and the pressurized fluid is introduced into the isolated portion of the horizontal wellbore 20 to form the transverse fracture 70 .
- FIGS. 12-14 illustrate the progression of the fracture believed to occur at a location along a horizontal wellbore 20 having a tunnel 80 .
- the pressurized fluid (represented by the plurality of arrows 90 ) is introduced into the horizontal wellbore 20 .
- the longitudinal fracture 50 is formed extending from the tunnel 80 .
- the initiated longitudinal fracture 50 extends and expands to encompass the horizontal wellbore 20 , thereby resulting in a transverse fracture 70 extending into the subterranean zone 40 , as shown in FIG. 14 .
- the one or more tunnels 80 may have any desired length L. However, as the length L of the tunnel 80 increases, influences from the horizontal wellbore 20 during fracturing are reduced, resulting in a greater likelihood that a transverse fracture with respect to the horizontal wellbore 20 will result. These influences include how the horizontal wellbore 20 affects the stress state of the subterranean zone 40 surrounding the tunnels 80 during fracturing. Moreover, for a tunnel 80 having a length L of three (3) times the diameter D or six (6) times the radius of the horizontal wellbore, the influences from the horizontal wellbore 20 are negligible. In fact, the influences from the horizontal wellbore 20 are also small with respect to tunnels 80 having lengths L smaller than three times the diameter D of the horizontal wellbore 20 .
- a horizontal wellbore 20 may have substantially inconsequential effects on a tunnel 80 having a length of three times the radius or more (e.g., three, three and a half, four, four and a half, five, and five and half times the radius of the horizontal wellbore).
- a tunnel 80 having a length less than three times the radius of the horizontal wellbore 20 such as two and a half, two, and even one and a half times the radius of the horizontal wellbore 20 , may also form transverse fractures notwithstanding the larger, though non-detrimental, effects on the formation of the transverse fractures associated with these smaller lengths.
- a further benefit of using one or more tunnels 80 is that the size of any isolated portion of the wellbore that may be used can be larger than conventionally isolated portions.
- the pressurized fluid may be introduced into the horizontal wellbore 20 at or near the tunnel(s) 80 without isolating a portion of the horizontal wellbore 20 .
- the manner of injecting the pressurized fluid into the horizontal wellbore 20 may be selected based on conditions associated with the wellbore 10 , the subterranean zone 40 , and/or any number of different considerations.
- porosity of the subterranean zone 40 may affect the manner chosen for introducing the pressurized fluid into the horizontal wellbore 20 .
- the tunnel 80 represents a vertical well, and, during fracturing of a vertical well, a longitudinal fracture more readily forms at a lower pressure.
- a longitudinal fracture extending from a vertical wellbore more readily occurs because of the stress state of the subterranean zone. Fractures propagate perpendicular to the minimum principal stress in the subterranean zone. Generally, the minimum principal stress is oriented horizontally. Thus, for a vertical wellbore, longitudinal fractures are more likely to form and form more readily at lower breakdown pressures.
- the tunnel 80 acts as a fracture initiation location for a longitudinal fracture with respect to the tunnel 80 . The fracture propagates to the horizontal wellbore perpendicular to the minimum principal stress of the subterranean zone.
- the initiated fracture intersects the horizontal wellbore 20 irrespective of the orientation thereof. That is, the horizontal wellbore 20 may be oriented horizontally or substantially horizontally, or may be slanted within the subterranean zone 40 , and the fracture initiated at the tunnel 80 still extends to the horizontal wellbore 20 to form a transverse fracture relative thereto. For example, some horizontal wellbores may be slanted at one or more locations so as to follow a particular formation within a subterranean reservoir.
- a wellbore extending through a subterranean zone, such as subterranean zone 40 that is horizontal, substantially horizontal, or that is at least partially slanted is considered horizontal within the scope of this disclosure.
- the longitudinal fracture 50 formed from the tunnel 80 represents a transverse fracture with respect to the horizontal wellbore 20 . Consequently, forming the tunnel 80 permits the formation of a transverse fracture along the horizontal wellbore 20 using fluid at a lower fluid pressure than would otherwise be required to form a transverse fracture along a horizontal wellbore.
- Use of the tunnel 80 also allows consistent formation of a transverse fracture 70 relative to the horizontal wellbore 20 . Further, depending on the downhole conditions, the pressurized fluid may be introduced without the need for isolating one or more portions of the well. Therefore, use of the tunnel 80 has lower associated fracturing costs. Moreover, the tunnel 80 is also believed to essentially eliminate the formation of multiple fractures and fracture tortuosity that may result during a fracturing operation.
- FIG. 15 shows test summary data for six test samples. Each of the test samples were performed by casting a bore and, in some of the experiments, a vertical or substantially vertical tunnel extending therefrom in hydrostone, a gypsum cement. The hydrostone was prepared having a ratio of 30 parts of water per 100 parts of hydrostone.
- FIGS. 16-22 show schematic diagrams of the configuration of the bores and, optionally, the tunnels within the hydrostone.
- the wellbore may have a slant of greater than or less than 5° and still be within the scope of the disclosure.
- the wellbore may have a slant of 15° or greater and a tunnel extending therefrom may still be operable to produce a transverse fracture at a relatively low fracture pressure.
- FIG. 16 is an elevation view of a schematic of test sample 1 .
- Test sample 1 was formed having a bore 100 having a casing 110 .
- a tunnel 120 extends vertically or substantially vertically from the bore 100 .
- the bore 100 was formed at approximately 5° from horizontal.
- An interior of the tunnel was in communication with an interior of the bore via an opening formed in the casing 110 .
- fluid pressure introduced into the bore 100 was exerted on the hydrostone (formation 130 ) via the tunnel 120 .
- a fracture initiated at a fluid pressure of 3323 psi transverse to the bore 100 .
- the fracture is believed to have initiated from the tunnel 120 and extended to encompass the bore 100 .
- the fracture extended transverse to the minimum horizontal stress.
- FIGS. 17 and 18 are schematic plan and elevation views, respectively, of test sample 2 .
- Test sample 2 included an uncased bore 100 formed at approximately 5° from horizontal. The bore 100 was also formed at approximately 45° within a horizontal plane, as shown in the plan view of FIG. 17 .
- the bore 100 of test sample 2 was not cased but did include a tunnel 120 extending vertically or substantially vertically from the bore 100 .
- a fracture transverse to the bore 100 was initiated in the test sample at 2889 psi. The fracture is believed to have initiated at the tunnel 120 and extended to encompass the bore 100 . The resulting fracture extended past the bore 100 without causing multiple fractures.
- FIG. 19 shows a schematic view of test sample 3 .
- Test sample 3 included a bore 100 that was not cased and did not include a tunnel, and the bore 100 was formed at an angle of 5° from horizontal.
- a fracture extending longitudinally along the bore 100 was formed at a fluid pressure of 3903 psi introduced into the bore 100 .
- FIG. 20 shows a schematic elevation view of test sample 4 .
- Test sample 4 included an uncased bore 100 formed at an angle of 5° from horizontal.
- a vertical or substantially vertical tunnel 120 extended from the bore 100 .
- Fluid pressure was introduced into the interior of the bore 100 and the tunnel 120 , which caused a fracture transverse to the bore 100 at a fluid pressure of 3596 psi. The fracture is believed to have initiated in the tunnel and propagated to encompass the bore 100 .
- FIG. 21 shows a schematic elevation view of test sample 5 .
- Test sample 5 included an uncased bore 100 formed at an angle of 5° from horizontal.
- the bore 100 did not include a tunnel extending therefrom.
- the bore 100 was subjected to an internal fluid pressure which, at a fluid pressure of 3525 psi, caused a fracture extending longitudinally along the bore 100 .
- FIG. 22 shows a schematic elevation view of test sample 6 , which includes a vertical or substantially vertical uncased bore 100 . Fluid pressure was introduced into the bore 100 , resulting in a fracture extending longitudinally along the bore 100 at a fluid pressure of 2726 psi. Test sample 6 illustrates the tendency to forming fractures extending longitudinally along a vertical bore under stress conditions similar to those in an earth formation.
Abstract
Producing transverse fractures in a horizontal well may be achieved at a relatively lower fracturing pressure by forming one or more tunnels extending from the horizontal wellbore. One or more tunnels may be formed at each location along the horizontal wellbore where a transverse fracture is desired. The tunnel(s) may be formed mechanically, optically, or hydraulically. Further, fracturing may be formed at a lower pressure than would otherwise be required to form transverse fractures from a horizontal wellbore. According to some implementations, the transverse fractures may be formed without isolating a portion of the horizontal wellbore.
Description
- This disclosure relates to forming transverse fractures into a subterranean zone from a horizontal well and more particularly to using a tunnel extending from the horizontal wellbore as a transverse fracture initiation location.
- Reservoir stimulation may be used to enhance recovery of reservoir fluids from a subterranean reservoir or zone. An example reservoir stimulation is hydraulic fracturing (interchangeably referred to as “fracturing”) in which fluid is pumped into a wellbore at an elevated pressure to form one or more fractures in the subterranean reservoir bordering the wellbore. The fractures formed during fracturing provide flow conduits emanating from the wellbore, providing flowpaths for the reservoir fluid to collect in the wellbore and subsequently be produced to the surface.
- One aspect of the present disclosure is directed to a method of forming transverse fractures extending from a horizontal wellbore. The method may include forming a wellbore having a horizontal wellbore portion within a subterranean zone and forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden. The tunnel may be formed with a length adapted to initiate a fracturing extending from the tunnel along a longitudinal axis thereof being influenced insignificantly by the horizontal wellbore portion. The method may also include applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form a fracture extending from the tunnel along a longitudinal axis thereof and propagating the initiated fracture to encompass the horizontal wellbore portion.
- A second aspect is directed to a wellbore system including a horizontal wellbore extending through a subterranean zone and at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden. The at least one tunnel may have a length adapted to form transverse fractures relative to the horizontal wellbore.
- A third aspect is directed to a method of forming fractures transverse to a horizontal wellbore including forming a wellbore having a horizontal wellbore portion within a subterranean zone and forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden. The tunnel may be formed with a length such that the horizontal wellbore portion has insignificant effects on formation of a fracture extending from the tunnel along a longitudinal axis thereof The method may also include applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form the fracture extending from the tunnel along the longitudinal axis thereof and propagating the initiated fracture to encompass the horizontal wellbore portion.
- One or more of the aspects may include one or more of the following features. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include inserting a tool in the horizontal wellbore portion and orienting the tool into a desired orientation to form the tunnel. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming a first tunnel extending from a first portion of the horizontal wellbore portion and forming a second tunnel extending from a second portion of the horizontal wellbore portion opposite the first portion. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with one of a hydrajet, a laser, or a drilling tool. Forming the tunnel with a hydrajet may include disposing a hydrajet into the horizontal wellbore portion at a desired location therein, orienting the hydrajet to form the tunnel, and operating the hydrajet to impinge a fluid flow onto a surface of the horizontal wellbore portion to form the tunnel. Forming the tunnel with a laser may include disposing a laser into the substantially horizontal wellbore portion, orienting the laser to form the tunnel, and operating the laser to form the tunnel. Forming the tunnel with a drilling tool may include disposing a drilling tool into the substantially horizontal wellbore portion, orienting the drilling tool to form the tunnel, and operating the drilling tool to form the tunnel.
- One or more of the aspects may also include one or more of the following features. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden at two or more different locations along an axial length of the horizontal wellbore portion. A portion of the horizontal wellbore may be isolated at a location of the tunnel before applying the fluid pressure. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion.
- One or more of the aspects may additionally include one or more of the following features. At least a portion of the horizontal wellbore may include a slanted portion, and the tunnel may extend from the slanted portion of the horizontal wellbore. The at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden may include a first substantially vertical tunnel extending from a first portion of the horizontal wellbore and a second substantially vertical tunnel extending from a second portion of the horizontal wellbore along a perimeter thereof opposite the first portion. The at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore may include a tunnel having a length of at least one and a half (1.5) times a radius of the horizontal wellbore, a tunnel having a length of at least three (3) times a radius of the horizontal wellbore, or a tunnel having a length of at least six (6) times a radius of the horizontal wellbore.
- One or more of the aspects may further include one or more of the following features. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion, forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion, or forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include inserting a tool in the horizontal wellbore portion and orienting the tool into a desired orientation to form the tunnel. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming the tunnel with one of a hydrajet, a laser, or a drilling tool. Forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden may include forming a tunnel at two or more different locations along an axial length of the horizontal wellbore portion. A portion of the horizontal wellbore portion may be isolated at a location of the tunnel before applying the fluid pressure.
- The details of one or more implementations are set forth in the accompanying drawings and the description below. Other features, objects, and advantages will be apparent from the description and drawings, and from the claims.
-
FIG. 1 shows a wellbore extending from a terranean surface into a subterranean zone. -
FIG. 2 shows a longitudinal fracture extending from a horizontal portion of a wellbore. -
FIG. 3 shows a longitudinal fracture extending from a horizontal wellbore. -
FIG. 4 shows transverse fractures extending from a horizontal portion of a wellbore. -
FIG. 5 shows a transverse fracture extending from a horizontal wellbore. -
FIG. 6 is a view along an axis of a horizontal wellbore in which a transverse fracture extends from the horizontal wellbore. -
FIG. 7 shows a longitudinal fracture extending from a vertical wellbore. -
FIG. 8 shows a tunnel extending from a portion of a horizontal wellbore. -
FIG. 9 shows first and second tunnels extending vertically from opposite locations along a perimeter of a horizontal wellbore. -
FIG. 10 is a cross-sectional view along A-A inFIG. 8 showing a transverse fracture surrounding the horizontal wellbore that was initiated from the tunnel. -
FIG. 11 is a cross-sectional view along B-B inFIG. 9 showing a transverse fracture surrounding the horizontal wellbore that was initiated from the tunnel. -
FIGS. 12-14 illustrate the formation of a transverse fracture relative to a horizontal wellbore. -
FIG. 15 is a summary table of experimentation data. -
FIGS. 16-22 are schematic diagrams illustrating the configuration of the bores extending through various test samples. - Producing transverse fractures in a horizontal well is described.
FIG. 1 shows awellbore 10 having a substantially horizontal portion (hereinafter referred to as “horizontal wellbore”) 20. Thewellbore 10 extends from aterranean surface 30 and extends into asubterranean zone 40. During the producing life of thewellbore 10, such as after formation of thewellbore 10 or at one or more occasions after thewellbore 10 has been producing reservoir fluids, thesubterranean zone 40 may be subjected to a fracturing operation to enhance production of the reservoir fluids. - Previously, fracturing was performed, for example, by isolating a relatively small section of the wellbore 10 (such as with one or more packers) and injecting a fluid into the isolated section at high pressure. The high pressure fluid increased the stress state of the
subterranean zone 40 resulting in the formation of fractures extending into the subterranean zone. However, controlling the orientation of the produced fracturing with respect to thewellbore 10 using this fracturing method was difficult, resulting in high friction pressure and sometimes creating axial fractures (also referred to herein as longitudinal fractures). In some instances, as the axially fractures propagated, the axial fractures would become re-oriented so as to be perpendicular to the minimum stress of thesubterranean zone 40. The re-orientation of these fractures may lead to a sand out. That is, the fracture is unable to accept additional proppant during the fracturing operation and only the carrier fluid is injected into the formation through these fractures.FIGS. 2 and 3 illustratelongitudinal fractures 50 extending longitudinally along anaxis 60 of thehorizontal wellbore 20. Longitudinal fractures, though, are not optimum and generally result in reduced production in comparison to transverse fractures formed in a horizontal wellbore.FIGS. 4-6 illustratetransverse fractures 70 formed in thesubterranean zone 40 bordering thehorizontal wellbore 20. Further, longitudinal fractures are generally more likely to result when fracturing a horizontal wellbore. - Longitudinal fractures are also more likely to be formed in vertical wellbores at lower fluid pressures. That is, longitudinal fractures are formed from a vertical wellbore at a lower breakdown pressure.
FIG. 7 illustrateslongitudinal fractures 50 extending from a vertical well. This characteristic can be utilized to promote formation of transverse fractures in a horizontal well. Particularly, one or more bores ortunnels 80 may be extended from ahorizontal wellbore 20 and used to promote the formation of a transverse fracture about thehorizontal wellbore 20. The one ormore tunnels 80 may extend towards the overburden. Generally, this means that the one ormore tunnels 80 extend vertically or substantially vertically from thehorizontal wellbore 20. For the purposes of this disclosure, forming the one ormore tunnels 80 towards the overburden is described as being formed vertical or substantially vertical. However, it is understood that thetunnels 80 may be formed in a direction other than vertical or substantially vertical in situations where the overburden is not at a location vertically offset from thehorizontal wellbore 20. Further, the one ormore tunnels 80 may deviate from vertical or substantial vertical by 15°. Thetunnels 80 promote the initiation and propagation of fractures that are independent of influences associated with horizontal and vertical orientations aspects of the well. -
FIG. 8 shows asingle tunnel 80 extending substantially vertically from afirst portion 82 of thehorizontal wellbore 20, whileFIG. 9 shows a pair oftunnels 80 extending from thehorizontal wellbore 20. InFIG. 9 , one of thetunnels 80 extends from thefirst portion 82 of thehorizontal wellbore 20, and thesecond tunnel 80 extends from asecond portion 84 of thehorizontal wellbore 20, opposite thefirst portion 82. Further, bothtunnels 80 are oriented vertically or substantially vertically so as to promote the formation of the transverse fracture relative to thehorizontal wellbore 20. - The
horizontal wellbore 20 may also includenumerous tunnels 80 formed along the length of thehorizontal wellbore 20. Particularly, atunnel 80 may be included on thehorizontal wellbore 20 at any location where a transverse fracture is desired. Thus, the number oftunnels 80 formed into thesubterranean zone 40 from thehorizontal wellbore 20 may be dependent upon the number oftransverse fractures 70 desired. Consequently, the number of tunnels may be determined according to the design of the stimulation activity. -
FIGS. 10 and 11 show cross-sectional views of thehorizontal wellbore 20 along lines A-A and B-B, respectively.FIGS. 10 and 11 show exampletransverse fractures 70 extending into thesubterranean zone 40 that were initiated at thetunnels 80. - The
tunnels 80 may be formed in any number of different ways. For example, one or more of thetunnels 80 may be formed mechanically, such as by drilling into the reservoir from thehorizontal wellbore 20. According to other implementations, one or more of thetunnels 80 may be formed using one or more lasers. A laser device may be included on a tubing string extending into thehorizontal wellbore 20 and used to form thetunnels 80 therefrom. According to still other implementations, one or more of thetunnels 80 may be formed with a stream of pressurized fluid, e.g., by hydrajetting, which forces a concentrated jet of fluid at elevated pressures towards a point within a wellbore. Example hydrajets that may be used are described in U.S. Pat. No. 5,361,856 and U.S. Pat. No. 5,494,103, each of which is incorporated herein by reference in their entirety. A pressurized fluid is then introduced into thehorizontal well 20 to form thetransverse fracture 70. - Unlike perforations formed in a wellbore, the
tunnel 80 has a better defined elongated shape with less damage to the surroundingsubterranean zone 40. This damage provides leak-off paths for the fracturing fluid to flow off into thesubterranean zone 40, thereby reducing the effective pressure exerted on thesubterranean zone 40 to form the fractures therein, i.e., the damage to the surroundingsubterranean zone 40 may cause an increase in the breakdown pressure required to fracture thesubterranean zone 40. Further, during a perforating operation, a plurality of perforations are formed in thesubterranean zone 40. These multiple perforations also act to lessen the effect of the pressurized fluid, because the multiple perforations require more pressure and fluid flow. - Additionally, perforating a wellbore with a hydrajet expels a plurality of fluid streams through respective nozzles. The fluid streams form a plurality of openings into the subterranean formation from the wellbore. However, the effect of using the plurality of fluid streams results in enlarging the openings into an enlarged cavity formed in the subterranean zone surrounding the wellbore. Thus, when the pressurized fluid is introduced into the wellbore for fracturing, the enlarged cavity reduces the effectiveness of concentrating the pressurized fluid to initiate and propagate a fracture in a controlled manner. Further, present hydrajets for perforating a subterranean zone are also deficient in that the nozzles expelling the fluid streams are not capable of being aligned with a particular orientation within the wellbore and are, thus, incapable of aligning openings formed by the hydrajet with a desired orientation.
- Once the one or
more tunnels 80 are formed, thesubterranean zone 40 may then be fractured. According to some implementations, the pressurized fluid may be introduced into thehorizontal wellbore 20 via a concentrated stream at or near the location of the tunnel(s) 80. Alternately, a portion of thehorizontal wellbore 20 including the tunnel(s) 80 is isolated according to any desired manner, and the pressurized fluid is introduced into the isolated portion of thehorizontal wellbore 20 to form thetransverse fracture 70. - It is believed that the introduced pressurized fluid works on the
tunnel 80 to form a longitudinal fracture extending therefrom. As this longitudinal fracture extends, the fracture encompasses thehorizontal wellbore 20, resulting in a transverse fracture with respect to thehorizontal wellbore 20.FIGS. 12-14 illustrate the progression of the fracture believed to occur at a location along ahorizontal wellbore 20 having atunnel 80. InFIG. 12 , the pressurized fluid (represented by the plurality of arrows 90) is introduced into thehorizontal wellbore 20. InFIG. 13 , thelongitudinal fracture 50 is formed extending from thetunnel 80. The initiatedlongitudinal fracture 50 extends and expands to encompass thehorizontal wellbore 20, thereby resulting in atransverse fracture 70 extending into thesubterranean zone 40, as shown inFIG. 14 . - The one or
more tunnels 80 may have any desired length L. However, as the length L of thetunnel 80 increases, influences from thehorizontal wellbore 20 during fracturing are reduced, resulting in a greater likelihood that a transverse fracture with respect to thehorizontal wellbore 20 will result. These influences include how thehorizontal wellbore 20 affects the stress state of thesubterranean zone 40 surrounding thetunnels 80 during fracturing. Moreover, for atunnel 80 having a length L of three (3) times the diameter D or six (6) times the radius of the horizontal wellbore, the influences from thehorizontal wellbore 20 are negligible. In fact, the influences from thehorizontal wellbore 20 are also small with respect totunnels 80 having lengths L smaller than three times the diameter D of thehorizontal wellbore 20. For example, ahorizontal wellbore 20 may have substantially inconsequential effects on atunnel 80 having a length of three times the radius or more (e.g., three, three and a half, four, four and a half, five, and five and half times the radius of the horizontal wellbore). Atunnel 80 having a length less than three times the radius of thehorizontal wellbore 20, such as two and a half, two, and even one and a half times the radius of thehorizontal wellbore 20, may also form transverse fractures notwithstanding the larger, though non-detrimental, effects on the formation of the transverse fractures associated with these smaller lengths. - A further benefit of using one or
more tunnels 80 is that the size of any isolated portion of the wellbore that may be used can be larger than conventionally isolated portions. In still other implementations, the pressurized fluid may be introduced into thehorizontal wellbore 20 at or near the tunnel(s) 80 without isolating a portion of thehorizontal wellbore 20. The manner of injecting the pressurized fluid into thehorizontal wellbore 20 may be selected based on conditions associated with thewellbore 10, thesubterranean zone 40, and/or any number of different considerations. For example, porosity of thesubterranean zone 40, the stress condition of thesubterranean zone 40, properties of the reservoir fluids, and/or any other considerations may affect the manner chosen for introducing the pressurized fluid into thehorizontal wellbore 20. - As mentioned above, the
tunnel 80 represents a vertical well, and, during fracturing of a vertical well, a longitudinal fracture more readily forms at a lower pressure. A longitudinal fracture extending from a vertical wellbore more readily occurs because of the stress state of the subterranean zone. Fractures propagate perpendicular to the minimum principal stress in the subterranean zone. Generally, the minimum principal stress is oriented horizontally. Thus, for a vertical wellbore, longitudinal fractures are more likely to form and form more readily at lower breakdown pressures. Thus, it is believed that by including thetunnel 80 along thehorizontal wellbore 20, thetunnel 80 acts as a fracture initiation location for a longitudinal fracture with respect to thetunnel 80. The fracture propagates to the horizontal wellbore perpendicular to the minimum principal stress of the subterranean zone. - Further, it is believed that the initiated fracture intersects the
horizontal wellbore 20 irrespective of the orientation thereof. That is, thehorizontal wellbore 20 may be oriented horizontally or substantially horizontally, or may be slanted within thesubterranean zone 40, and the fracture initiated at thetunnel 80 still extends to thehorizontal wellbore 20 to form a transverse fracture relative thereto. For example, some horizontal wellbores may be slanted at one or more locations so as to follow a particular formation within a subterranean reservoir. A wellbore extending through a subterranean zone, such assubterranean zone 40, that is horizontal, substantially horizontal, or that is at least partially slanted is considered horizontal within the scope of this disclosure. Thus, thelongitudinal fracture 50 formed from thetunnel 80 represents a transverse fracture with respect to thehorizontal wellbore 20. Consequently, forming thetunnel 80 permits the formation of a transverse fracture along thehorizontal wellbore 20 using fluid at a lower fluid pressure than would otherwise be required to form a transverse fracture along a horizontal wellbore. Use of thetunnel 80 also allows consistent formation of atransverse fracture 70 relative to thehorizontal wellbore 20. Further, depending on the downhole conditions, the pressurized fluid may be introduced without the need for isolating one or more portions of the well. Therefore, use of thetunnel 80 has lower associated fracturing costs. Moreover, thetunnel 80 is also believed to essentially eliminate the formation of multiple fractures and fracture tortuosity that may result during a fracturing operation. - Experimentation, described below, has been performed demonstrating the effectiveness of a tunnel extending from a horizontal wellbore in forming a fracture transverse to the horizontal wellbore at a relatively low fracturing pressure.
FIG. 15 shows test summary data for six test samples. Each of the test samples were performed by casting a bore and, in some of the experiments, a vertical or substantially vertical tunnel extending therefrom in hydrostone, a gypsum cement. The hydrostone was prepared having a ratio of 30 parts of water per 100 parts of hydrostone.FIGS. 16-22 show schematic diagrams of the configuration of the bores and, optionally, the tunnels within the hydrostone. Each of the test samples were subjected to a 3000 psi pressure on a top surface (as shown in the figures), which resulted in the following stress state: vertical stress=3000 psi, minimum horizontal stress=1800 psi, and maximum horizontal stress=2500 psi. It is noted that, although some of the tests described inFIGS. 15-22 include a wellbore slanted relative to horizontal (e.g., some wellbores have a slant of 5° relative to horizontal), the wellbores may have a slant of greater than or less than 5° and still be within the scope of the disclosure. For example, in some instances, the wellbore may have a slant of 15° or greater and a tunnel extending therefrom may still be operable to produce a transverse fracture at a relatively low fracture pressure. -
FIG. 16 is an elevation view of a schematic oftest sample 1.Test sample 1 was formed having abore 100 having acasing 110. Atunnel 120 extends vertically or substantially vertically from thebore 100. (Dimensions of thebore 100 andtunnel 120 are provided in the table ofFIG. 15 .) Thebore 100 was formed at approximately 5° from horizontal. An interior of the tunnel was in communication with an interior of the bore via an opening formed in thecasing 110. As a result of thecasing 110, fluid pressure introduced into thebore 100 was exerted on the hydrostone (formation 130) via thetunnel 120. As a result, a fracture initiated at a fluid pressure of 3323 psi transverse to thebore 100. The fracture is believed to have initiated from thetunnel 120 and extended to encompass thebore 100. The fracture extended transverse to the minimum horizontal stress. -
FIGS. 17 and 18 are schematic plan and elevation views, respectively, oftest sample 2.Test sample 2 included anuncased bore 100 formed at approximately 5° from horizontal. Thebore 100 was also formed at approximately 45° within a horizontal plane, as shown in the plan view ofFIG. 17 . Thebore 100 oftest sample 2 was not cased but did include atunnel 120 extending vertically or substantially vertically from thebore 100. A fracture transverse to thebore 100 was initiated in the test sample at 2889 psi. The fracture is believed to have initiated at thetunnel 120 and extended to encompass thebore 100. The resulting fracture extended past thebore 100 without causing multiple fractures. -
FIG. 19 shows a schematic view oftest sample 3.Test sample 3 included abore 100 that was not cased and did not include a tunnel, and thebore 100 was formed at an angle of 5° from horizontal. A fracture extending longitudinally along thebore 100 was formed at a fluid pressure of 3903 psi introduced into thebore 100. -
FIG. 20 shows a schematic elevation view oftest sample 4.Test sample 4 included anuncased bore 100 formed at an angle of 5° from horizontal. A vertical or substantiallyvertical tunnel 120 extended from thebore 100. Fluid pressure was introduced into the interior of thebore 100 and thetunnel 120, which caused a fracture transverse to thebore 100 at a fluid pressure of 3596 psi. The fracture is believed to have initiated in the tunnel and propagated to encompass thebore 100. -
FIG. 21 shows a schematic elevation view oftest sample 5.Test sample 5 included anuncased bore 100 formed at an angle of 5° from horizontal. Thebore 100 did not include a tunnel extending therefrom. Thebore 100 was subjected to an internal fluid pressure which, at a fluid pressure of 3525 psi, caused a fracture extending longitudinally along thebore 100. -
FIG. 22 shows a schematic elevation view oftest sample 6, which includes a vertical or substantially verticaluncased bore 100. Fluid pressure was introduced into thebore 100, resulting in a fracture extending longitudinally along thebore 100 at a fluid pressure of 2726 psi.Test sample 6 illustrates the tendency to forming fractures extending longitudinally along a vertical bore under stress conditions similar to those in an earth formation. - In each of the experiments, the resulting fractures propagated perpendicular to the minimum stress state. Further, the results show that, for the bores including vertical or substantially vertical tunnels extending therefrom, a fracture transverse to the bore was formed at a fluid pressure approximately the same as or lower than pressures forming a fracture longitudinal to those bores that did not include a vertical or substantially vertical tunnel extending therefrom.
- A number of implementations have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the disclosure. Accordingly, other implementations are within the scope of the following claims.
Claims (26)
1. A method of forming transverse fractures extending from a horizontal wellbore comprising:
forming a wellbore within a subterranean zone, the wellbore having a horizontal wellbore portion;
forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden, the tunnel formed with a length adapted to initiate a fracturing extending from the tunnel along a longitudinal axis thereof being influenced insignificantly by the horizontal wellbore portion;
applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form a fracture extending from the tunnel along a longitudinal axis thereof; and
propagating the initiated fracture to encompass the horizontal wellbore portion.
2. The method of claim 1 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises:
inserting a tool in the horizontal wellbore portion; and
orienting the tool into a desired orientation to form the tunnel.
3. The method of claim 1 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises:
forming a first tunnel extending from a first portion of the horizontal wellbore portion; and
forming a second tunnel extending from a second portion of the horizontal wellbore portion opposite the first portion.
4. The method of claim 1 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with one of a hydrajet, a laser, or a drilling tool.
5. The method of claim 4 , wherein forming the tunnel with a hydrajet comprises:
disposing a hydrajet into the horizontal wellbore portion at a desired location therein;
orienting the hydrajet to form the tunnel; and
operating the hydrajet to impinge a fluid flow onto a surface of the horizontal wellbore portion to form the tunnel.
6. The method of claim 4 , wherein forming the tunnel with a laser comprises:
disposing a laser into the substantially horizontal wellbore portion;
orienting the laser to form the tunnel; and
operating the laser to form the tunnel.
7. The method of claim 4 , wherein forming the tunnel with a drilling tool comprises:
disposing a drilling tool into the substantially horizontal wellbore portion;
orienting the drilling tool to form the tunnel; and
operating the drilling tool to form the tunnel.
8. The method of claim 1 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden at two or more different locations along an axial length of the horizontal wellbore portion.
9. The method of claim 1 further comprising isolating a portion of the horizontal wellbore at a location of the tunnel before applying the fluid pressure.
10. The method of claim 1 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion.
11. The method of claim 1 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion.
12. The method of claim 1 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion.
13. A wellbore system comprising:
a horizontal wellbore extending through a subterranean zone; and
at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden, the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore.
14. The wellbore system of claim 13 , wherein at least a portion of the horizontal wellbore comprises a slanted portion and wherein the tunnel extends from the slanted portion of the horizontal wellbore.
15. The wellbore system of claim 13 , wherein the at least one tunnel extending from the horizontal wellbore into the subterranean zone towards the overburden comprises:
a first substantially vertical tunnel extending from a first portion of the horizontal wellbore; and
a second substantially vertical tunnel extending from a second portion of the horizontal wellbore along a perimeter thereof opposite the first portion.
16. The wellbore system of claim 13 , wherein the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore comprises a tunnel having a length of at least one and a half (1.5) times a radius of the horizontal wellbore.
17. The wellbore system of claim 13 , wherein the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore comprises a tunnel having a length of at least three (3) times a radius of the horizontal wellbore.
18. The wellbore system of claim 13 , wherein the at least one tunnel having a length adapted to form transverse fractures relative to the horizontal wellbore comprises a tunnel having a length of at least six (6) times a radius of the horizontal wellbore.
19. A method of forming fractures transverse to a horizontal wellbore comprising:
forming a wellbore having a horizontal wellbore portion within a subterranean zone;
forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden, the tunnel formed with a length such that the horizontal wellbore portion has insignificant effects on formation of a fracture extending from the tunnel along a longitudinal axis thereof;
applying fluid pressure to an interior of the horizontal wellbore portion at a location proximate the tunnel to form the fracture extending from the tunnel along the longitudinal axis thereof; and
propagating the initiated fracture to encompass the horizontal wellbore portion.
20. The method of claim 19 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least one and a half (1.5) times a radius of the horizontal wellbore portion.
21. The method of claim 19 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least three (3) times a radius of the horizontal wellbore portion.
22. The method of claim 19 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with a length of at least six (6) times a radius of the horizontal wellbore portion.
23. The method of claim 19 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises:
inserting a tool in the horizontal wellbore portion; and
orienting the tool into a desired orientation to form the tunnel.
24. The method of claim 19 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprises forming the tunnel with one of a hydrajet, a laser, or a drilling tool.
25. The method of claim 19 , wherein forming a tunnel extending from the horizontal wellbore portion into the subterranean zone towards the overburden comprising forming a tunnel at two or more different locations along an axial length of the horizontal wellbore portion.
26. The method of claim 19 further comprising isolating a portion of the horizontal wellbore portion at a location of the tunnel before applying the fluid pressure.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/558,747 US20110061869A1 (en) | 2009-09-14 | 2009-09-14 | Formation of Fractures Within Horizontal Well |
PCT/US2010/048612 WO2011032083A1 (en) | 2009-09-14 | 2010-09-13 | Formation of fractures within horizontal well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/558,747 US20110061869A1 (en) | 2009-09-14 | 2009-09-14 | Formation of Fractures Within Horizontal Well |
Publications (1)
Publication Number | Publication Date |
---|---|
US20110061869A1 true US20110061869A1 (en) | 2011-03-17 |
Family
ID=42985443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/558,747 Abandoned US20110061869A1 (en) | 2009-09-14 | 2009-09-14 | Formation of Fractures Within Horizontal Well |
Country Status (2)
Country | Link |
---|---|
US (1) | US20110061869A1 (en) |
WO (1) | WO2011032083A1 (en) |
Cited By (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110083849A1 (en) * | 2006-12-08 | 2011-04-14 | Oleg Medvedev | Heterogeneous proppant placement in a fracture with removable channelant fill |
US20110114313A1 (en) * | 2006-12-08 | 2011-05-19 | Timothy Lesko | Heterogeneous proppant placement in a fracture with removable channelant fill |
WO2013012772A1 (en) * | 2011-07-15 | 2013-01-24 | Schlumberger Canada Limited | Heterogeneous proppant placement in a fracture with removable extrametrical material fill |
US8424617B2 (en) | 2008-08-20 | 2013-04-23 | Foro Energy Inc. | Methods and apparatus for delivering high power laser energy to a surface |
US20130228372A1 (en) * | 2008-08-20 | 2013-09-05 | Foro Energy Inc. | High power laser perforating and laser fracturing tools and methods of use |
US8571368B2 (en) | 2010-07-21 | 2013-10-29 | Foro Energy, Inc. | Optical fiber configurations for transmission of laser energy over great distances |
US8627901B1 (en) | 2009-10-01 | 2014-01-14 | Foro Energy, Inc. | Laser bottom hole assembly |
US8662160B2 (en) | 2008-08-20 | 2014-03-04 | Foro Energy Inc. | Systems and conveyance structures for high power long distance laser transmission |
US9027668B2 (en) | 2008-08-20 | 2015-05-12 | Foro Energy, Inc. | Control system for high power laser drilling workover and completion unit |
US9074422B2 (en) | 2011-02-24 | 2015-07-07 | Foro Energy, Inc. | Electric motor for laser-mechanical drilling |
US9080425B2 (en) | 2008-10-17 | 2015-07-14 | Foro Energy, Inc. | High power laser photo-conversion assemblies, apparatuses and methods of use |
US9089928B2 (en) | 2008-08-20 | 2015-07-28 | Foro Energy, Inc. | Laser systems and methods for the removal of structures |
US9138786B2 (en) | 2008-10-17 | 2015-09-22 | Foro Energy, Inc. | High power laser pipeline tool and methods of use |
US9244235B2 (en) | 2008-10-17 | 2016-01-26 | Foro Energy, Inc. | Systems and assemblies for transferring high power laser energy through a rotating junction |
US9242309B2 (en) | 2012-03-01 | 2016-01-26 | Foro Energy Inc. | Total internal reflection laser tools and methods |
US9267330B2 (en) | 2008-08-20 | 2016-02-23 | Foro Energy, Inc. | Long distance high power optical laser fiber break detection and continuity monitoring systems and methods |
US9347271B2 (en) | 2008-10-17 | 2016-05-24 | Foro Energy, Inc. | Optical fiber cable for transmission of high power laser energy over great distances |
US9360643B2 (en) | 2011-06-03 | 2016-06-07 | Foro Energy, Inc. | Rugged passively cooled high power laser fiber optic connectors and methods of use |
US9360631B2 (en) | 2008-08-20 | 2016-06-07 | Foro Energy, Inc. | Optics assembly for high power laser tools |
US9562395B2 (en) | 2008-08-20 | 2017-02-07 | Foro Energy, Inc. | High power laser-mechanical drilling bit and methods of use |
US9664012B2 (en) | 2008-08-20 | 2017-05-30 | Foro Energy, Inc. | High power laser decomissioning of multistring and damaged wells |
US9669492B2 (en) | 2008-08-20 | 2017-06-06 | Foro Energy, Inc. | High power laser offshore decommissioning tool, system and methods of use |
WO2018049368A1 (en) * | 2016-09-12 | 2018-03-15 | Schlumberger Technology Corporation | Wellbore landing methods for reservoir stimulation |
US10221687B2 (en) | 2015-11-26 | 2019-03-05 | Merger Mines Corporation | Method of mining using a laser |
US10301912B2 (en) * | 2008-08-20 | 2019-05-28 | Foro Energy, Inc. | High power laser flow assurance systems, tools and methods |
WO2019168885A1 (en) * | 2018-02-27 | 2019-09-06 | Schlumberger Technology Corporation | Producing disconnected propped fractures |
US10815766B2 (en) | 2015-02-27 | 2020-10-27 | Schlumberger Technology Corporation | Vertical drilling and fracturing methodology |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
US11448054B2 (en) | 2020-05-19 | 2022-09-20 | Saudi Arabian Oil Company | Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery |
US11466549B2 (en) * | 2017-01-04 | 2022-10-11 | Schlumberger Technology Corporation | Reservoir stimulation comprising hydraulic fracturing through extended tunnels |
US11486214B2 (en) | 2017-07-10 | 2022-11-01 | Schlumberger Technology Corporation | Controlled release of hose |
US11840909B2 (en) | 2016-09-12 | 2023-12-12 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
US11851989B2 (en) | 2021-12-03 | 2023-12-26 | Saudi Arabian Oil Company | Cooling methodology to improve hydraulic fracturing efficiency and reduce breakdown pressure |
US20240052735A1 (en) * | 2022-08-10 | 2024-02-15 | Saudi Arabian Oil Company | Method of increasing hydrocarbon recovery from a wellbore penetrating a tight hydrocarbon formation by a hydro-jetting tool that jets a thermally controlled fluid |
Citations (74)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3878884A (en) * | 1973-04-02 | 1975-04-22 | Cecil B Raleigh | Formation fracturing method |
US4262743A (en) * | 1979-09-04 | 1981-04-21 | Halliburton Company | Diffuser for wellhead isolation tool |
US4797821A (en) * | 1987-04-02 | 1989-01-10 | Halliburton Company | Method of analyzing naturally fractured reservoirs |
US4828028A (en) * | 1987-02-09 | 1989-05-09 | Halliburton Company | Method for performing fracturing operations |
US4836280A (en) * | 1987-09-29 | 1989-06-06 | Halliburton Company | Method of evaluating subsurface fracturing operations |
US5005643A (en) * | 1990-05-11 | 1991-04-09 | Halliburton Company | Method of determining fracture parameters for heterogenous formations |
US5018578A (en) * | 1990-08-06 | 1991-05-28 | Halliburton Company | Method of arresting hydraulic fracture propagation |
US5050674A (en) * | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
US5111881A (en) * | 1990-09-07 | 1992-05-12 | Halliburton Company | Method to control fracture orientation in underground formation |
US5226445A (en) * | 1992-05-05 | 1993-07-13 | Halliburton Company | Valve having convex sealing surface and concave seating surface |
US5233863A (en) * | 1992-03-30 | 1993-08-10 | Halliburton Company | Fluid loss measuring system and method |
US5265462A (en) * | 1992-05-13 | 1993-11-30 | Halliburton Company | Method and apparatus for determining permeability, diffusivity, porosity, and gas storage in gas-containing substrates |
US5285683A (en) * | 1992-10-01 | 1994-02-15 | Halliburton Company | Method and apparatus for determining orientation of a wellbore relative to formation stress fields |
US5305211A (en) * | 1990-09-20 | 1994-04-19 | Halliburton Company | Method for determining fluid-loss coefficient and spurt-loss |
US5315864A (en) * | 1993-04-06 | 1994-05-31 | Halliburton Company | Start/stop method to determine static gel strength |
US5325723A (en) * | 1992-12-04 | 1994-07-05 | Halliburton Company | Core sample test method and apparatus |
US5325923A (en) * | 1992-09-29 | 1994-07-05 | Halliburton Company | Well completions with expandable casing portions |
US5360066A (en) * | 1992-12-16 | 1994-11-01 | Halliburton Company | Method for controlling sand production of formations and for optimizing hydraulic fracturing through perforation orientation |
US5361856A (en) * | 1992-09-29 | 1994-11-08 | Halliburton Company | Well jetting apparatus and met of modifying a well therewith |
US5396957A (en) * | 1992-09-29 | 1995-03-14 | Halliburton Company | Well completions with expandable casing portions |
US5396805A (en) * | 1993-09-30 | 1995-03-14 | Halliburton Company | Force sensor and sensing method using crystal rods and light signals |
US5431225A (en) * | 1994-09-21 | 1995-07-11 | Halliburton Company | Sand control well completion methods for poorly consolidated formations |
US5482122A (en) * | 1994-12-09 | 1996-01-09 | Halliburton Company | Oriented-radial-cores retrieval for measurements of directional properties |
US5499678A (en) * | 1994-08-02 | 1996-03-19 | Halliburton Company | Coplanar angular jetting head for well perforating |
US5765642A (en) * | 1996-12-23 | 1998-06-16 | Halliburton Energy Services, Inc. | Subterranean formation fracturing methods |
US5787983A (en) * | 1997-01-03 | 1998-08-04 | Halliburton Energy Services, Inc. | Methods of delaying well destruction due to subsidence |
US5868030A (en) * | 1997-07-01 | 1999-02-09 | Halliburton Energy Services, Inc. | Core sample test method and apparatus |
US5960880A (en) * | 1996-08-27 | 1999-10-05 | Halliburton Energy Services, Inc. | Unconsolidated formation stimulation with sand filtration |
US6283210B1 (en) * | 1999-09-01 | 2001-09-04 | Halliburton Energy Services, Inc. | Proactive conformance for oil or gas wells |
US6347283B1 (en) * | 2000-07-10 | 2002-02-12 | Halliburton Energy Services, Inc. | Methods for combining well test analysis with wavelet analysis |
US6619394B2 (en) * | 2000-12-07 | 2003-09-16 | Halliburton Energy Services, Inc. | Method and apparatus for treating a wellbore with vibratory waves to remove particles therefrom |
US6662874B2 (en) * | 2001-09-28 | 2003-12-16 | Halliburton Energy Services, Inc. | System and method for fracturing a subterranean well formation for improving hydrocarbon production |
US6719054B2 (en) * | 2001-09-28 | 2004-04-13 | Halliburton Energy Services, Inc. | Method for acid stimulating a subterranean well formation for improving hydrocarbon production |
US6719055B2 (en) * | 2002-01-23 | 2004-04-13 | Halliburton Energy Services, Inc. | Method for drilling and completing boreholes with electro-rheological fluids |
US6725933B2 (en) * | 2001-09-28 | 2004-04-27 | Halliburton Energy Services, Inc. | Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production |
US6795773B2 (en) * | 2001-09-07 | 2004-09-21 | Halliburton Energy Services, Inc. | Well completion method, including integrated approach for fracture optimization |
US6805199B2 (en) * | 2002-10-17 | 2004-10-19 | Halliburton Energy Services, Inc. | Process and system for effective and accurate foam cement generation and placement |
US6837523B2 (en) * | 2002-12-05 | 2005-01-04 | Halliburton Energy Services, Inc. | Piping with integral force absorbing restraining system |
US20050161081A1 (en) * | 2004-01-22 | 2005-07-28 | Halliburton Energy Services | System and method for treating a fluid in a pipe |
US6938690B2 (en) * | 2001-09-28 | 2005-09-06 | Halliburton Energy Services, Inc. | Downhole tool and method for fracturing a subterranean well formation |
US6978211B2 (en) * | 2003-12-08 | 2005-12-20 | Halliburton Energy Services, Inc. | Methods and systems for using wavelet analysis in subterranean applications |
US20060102343A1 (en) * | 2004-11-12 | 2006-05-18 | Skinner Neal G | Drilling, perforating and formation analysis |
US7066265B2 (en) * | 2003-09-24 | 2006-06-27 | Halliburton Energy Services, Inc. | System and method of production enhancement and completion of a well |
US20060155473A1 (en) * | 2005-01-08 | 2006-07-13 | Halliburton Energy Services, Inc. | Method and system for determining formation properties based on fracture treatment |
US7090153B2 (en) * | 2004-07-29 | 2006-08-15 | Halliburton Energy Services, Inc. | Flow conditioning system and method for fluid jetting tools |
US7100688B2 (en) * | 2002-09-20 | 2006-09-05 | Halliburton Energy Services, Inc. | Fracture monitoring using pressure-frequency analysis |
US20060201674A1 (en) * | 2005-03-10 | 2006-09-14 | Halliburton Energy Services, Inc. | Methods of treating subterranean formations using low-temperature fluids |
US7150327B2 (en) * | 2004-04-07 | 2006-12-19 | Halliburton Energy Services, Inc. | Workover unit and method of utilizing same |
US7225869B2 (en) * | 2004-03-24 | 2007-06-05 | Halliburton Energy Services, Inc. | Methods of isolating hydrajet stimulated zones |
US7234529B2 (en) * | 2004-04-07 | 2007-06-26 | Halliburton Energy Services, Inc. | Flow switchable check valve and method |
US7237612B2 (en) * | 2004-11-17 | 2007-07-03 | Halliburton Energy Services, Inc. | Methods of initiating a fracture tip screenout |
US7243723B2 (en) * | 2004-06-18 | 2007-07-17 | Halliburton Energy Services, Inc. | System and method for fracturing and gravel packing a borehole |
US7273313B2 (en) * | 2004-06-17 | 2007-09-25 | Halliburton Energy Services, Inc. | Mixing device for mixing bulk and liquid material |
US7287592B2 (en) * | 2004-06-11 | 2007-10-30 | Halliburton Energy Services, Inc. | Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool |
US20070272407A1 (en) * | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
US7337844B2 (en) * | 2006-05-09 | 2008-03-04 | Halliburton Energy Services, Inc. | Perforating and fracturing |
US7343975B2 (en) * | 2005-09-06 | 2008-03-18 | Halliburton Energy Services, Inc. | Method for stimulating a well |
US20080083538A1 (en) * | 2006-10-06 | 2008-04-10 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
US7370701B2 (en) * | 2004-06-30 | 2008-05-13 | Halliburton Energy Services, Inc. | Wellbore completion design to naturally separate water and solids from oil and gas |
US7398825B2 (en) * | 2004-12-03 | 2008-07-15 | Halliburton Energy Services, Inc. | Methods of controlling sand and water production in subterranean zones |
US7429332B2 (en) * | 2004-06-30 | 2008-09-30 | Halliburton Energy Services, Inc. | Separating constituents of a fluid mixture |
US7431090B2 (en) * | 2005-06-22 | 2008-10-07 | Halliburton Energy Services, Inc. | Methods and apparatus for multiple fracturing of subterranean formations |
US7445045B2 (en) * | 2003-12-04 | 2008-11-04 | Halliburton Energy Services, Inc. | Method of optimizing production of gas from vertical wells in coal seams |
US7503404B2 (en) * | 2004-04-14 | 2009-03-17 | Halliburton Energy Services, Inc, | Methods of well stimulation during drilling operations |
US7506689B2 (en) * | 2005-02-22 | 2009-03-24 | Halliburton Energy Services, Inc. | Fracturing fluids comprising degradable diverting agents and methods of use in subterranean formations |
US20090084189A1 (en) * | 2007-09-28 | 2009-04-02 | Halliburton Energy Services, Inc. | Measuring mechanical properties |
US7520327B2 (en) * | 2006-07-20 | 2009-04-21 | Halliburton Energy Services, Inc. | Methods and materials for subterranean fluid forming barriers in materials surrounding wells |
US7530396B1 (en) * | 2008-01-24 | 2009-05-12 | Halliburton Energy Services, Inc. | Self repairing cement compositions and methods of using same |
US20090125280A1 (en) * | 2007-11-13 | 2009-05-14 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7543635B2 (en) * | 2004-11-12 | 2009-06-09 | Halliburton Energy Services, Inc. | Fracture characterization using reservoir monitoring devices |
US7549320B2 (en) * | 2007-01-11 | 2009-06-23 | Halliburton Energy Services, Inc. | Measuring cement properties |
US7571766B2 (en) * | 2006-09-29 | 2009-08-11 | Halliburton Energy Services, Inc. | Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage |
US7580796B2 (en) * | 2007-07-31 | 2009-08-25 | Halliburton Energy Services, Inc. | Methods and systems for evaluating and treating previously-fractured subterranean formations |
US20100326659A1 (en) * | 2009-06-29 | 2010-12-30 | Schultz Roger L | Wellbore laser operations |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5875843A (en) * | 1995-07-14 | 1999-03-02 | Hill; Gilman A. | Method for vertically extending a well |
US7228908B2 (en) * | 2004-12-02 | 2007-06-12 | Halliburton Energy Services, Inc. | Hydrocarbon sweep into horizontal transverse fractured wells |
US7735556B2 (en) * | 2007-05-02 | 2010-06-15 | Bj Services Company | Method of isolating open perforations in horizontal wellbores using an ultra lightweight proppant |
-
2009
- 2009-09-14 US US12/558,747 patent/US20110061869A1/en not_active Abandoned
-
2010
- 2010-09-13 WO PCT/US2010/048612 patent/WO2011032083A1/en active Application Filing
Patent Citations (80)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3878884A (en) * | 1973-04-02 | 1975-04-22 | Cecil B Raleigh | Formation fracturing method |
US4262743A (en) * | 1979-09-04 | 1981-04-21 | Halliburton Company | Diffuser for wellhead isolation tool |
US4828028A (en) * | 1987-02-09 | 1989-05-09 | Halliburton Company | Method for performing fracturing operations |
US4797821A (en) * | 1987-04-02 | 1989-01-10 | Halliburton Company | Method of analyzing naturally fractured reservoirs |
US4836280A (en) * | 1987-09-29 | 1989-06-06 | Halliburton Company | Method of evaluating subsurface fracturing operations |
US5050674A (en) * | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
US5005643A (en) * | 1990-05-11 | 1991-04-09 | Halliburton Company | Method of determining fracture parameters for heterogenous formations |
US5018578A (en) * | 1990-08-06 | 1991-05-28 | Halliburton Company | Method of arresting hydraulic fracture propagation |
US5111881A (en) * | 1990-09-07 | 1992-05-12 | Halliburton Company | Method to control fracture orientation in underground formation |
US5305211A (en) * | 1990-09-20 | 1994-04-19 | Halliburton Company | Method for determining fluid-loss coefficient and spurt-loss |
US5233863A (en) * | 1992-03-30 | 1993-08-10 | Halliburton Company | Fluid loss measuring system and method |
US5226445A (en) * | 1992-05-05 | 1993-07-13 | Halliburton Company | Valve having convex sealing surface and concave seating surface |
US5265462A (en) * | 1992-05-13 | 1993-11-30 | Halliburton Company | Method and apparatus for determining permeability, diffusivity, porosity, and gas storage in gas-containing substrates |
US5494103A (en) * | 1992-09-29 | 1996-02-27 | Halliburton Company | Well jetting apparatus |
US5325923A (en) * | 1992-09-29 | 1994-07-05 | Halliburton Company | Well completions with expandable casing portions |
US5361856A (en) * | 1992-09-29 | 1994-11-08 | Halliburton Company | Well jetting apparatus and met of modifying a well therewith |
US5396957A (en) * | 1992-09-29 | 1995-03-14 | Halliburton Company | Well completions with expandable casing portions |
US5285683A (en) * | 1992-10-01 | 1994-02-15 | Halliburton Company | Method and apparatus for determining orientation of a wellbore relative to formation stress fields |
US5325723A (en) * | 1992-12-04 | 1994-07-05 | Halliburton Company | Core sample test method and apparatus |
US5360066A (en) * | 1992-12-16 | 1994-11-01 | Halliburton Company | Method for controlling sand production of formations and for optimizing hydraulic fracturing through perforation orientation |
US5315864A (en) * | 1993-04-06 | 1994-05-31 | Halliburton Company | Start/stop method to determine static gel strength |
US5396805A (en) * | 1993-09-30 | 1995-03-14 | Halliburton Company | Force sensor and sensing method using crystal rods and light signals |
US5499678A (en) * | 1994-08-02 | 1996-03-19 | Halliburton Company | Coplanar angular jetting head for well perforating |
US5431225A (en) * | 1994-09-21 | 1995-07-11 | Halliburton Company | Sand control well completion methods for poorly consolidated formations |
US5547023A (en) * | 1994-09-21 | 1996-08-20 | Halliburton Company | Sand control well completion methods for poorly consolidated formations |
US5482122A (en) * | 1994-12-09 | 1996-01-09 | Halliburton Company | Oriented-radial-cores retrieval for measurements of directional properties |
US5960880A (en) * | 1996-08-27 | 1999-10-05 | Halliburton Energy Services, Inc. | Unconsolidated formation stimulation with sand filtration |
US5765642A (en) * | 1996-12-23 | 1998-06-16 | Halliburton Energy Services, Inc. | Subterranean formation fracturing methods |
US5787983A (en) * | 1997-01-03 | 1998-08-04 | Halliburton Energy Services, Inc. | Methods of delaying well destruction due to subsidence |
US5868030A (en) * | 1997-07-01 | 1999-02-09 | Halliburton Energy Services, Inc. | Core sample test method and apparatus |
US6283210B1 (en) * | 1999-09-01 | 2001-09-04 | Halliburton Energy Services, Inc. | Proactive conformance for oil or gas wells |
US6347283B1 (en) * | 2000-07-10 | 2002-02-12 | Halliburton Energy Services, Inc. | Methods for combining well test analysis with wavelet analysis |
US6619394B2 (en) * | 2000-12-07 | 2003-09-16 | Halliburton Energy Services, Inc. | Method and apparatus for treating a wellbore with vibratory waves to remove particles therefrom |
US6795773B2 (en) * | 2001-09-07 | 2004-09-21 | Halliburton Energy Services, Inc. | Well completion method, including integrated approach for fracture optimization |
US6662874B2 (en) * | 2001-09-28 | 2003-12-16 | Halliburton Energy Services, Inc. | System and method for fracturing a subterranean well formation for improving hydrocarbon production |
US6719054B2 (en) * | 2001-09-28 | 2004-04-13 | Halliburton Energy Services, Inc. | Method for acid stimulating a subterranean well formation for improving hydrocarbon production |
US6725933B2 (en) * | 2001-09-28 | 2004-04-27 | Halliburton Energy Services, Inc. | Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production |
US6779607B2 (en) * | 2001-09-28 | 2004-08-24 | Halliburton Energy Services, Inc. | Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production |
US6938690B2 (en) * | 2001-09-28 | 2005-09-06 | Halliburton Energy Services, Inc. | Downhole tool and method for fracturing a subterranean well formation |
US6719055B2 (en) * | 2002-01-23 | 2004-04-13 | Halliburton Energy Services, Inc. | Method for drilling and completing boreholes with electro-rheological fluids |
US6959773B2 (en) * | 2002-01-23 | 2005-11-01 | Halliburton Energy Services, Inc. | Method for drilling and completing boreholes with electro-rheological fluids |
US7100688B2 (en) * | 2002-09-20 | 2006-09-05 | Halliburton Energy Services, Inc. | Fracture monitoring using pressure-frequency analysis |
US6805199B2 (en) * | 2002-10-17 | 2004-10-19 | Halliburton Energy Services, Inc. | Process and system for effective and accurate foam cement generation and placement |
US6837523B2 (en) * | 2002-12-05 | 2005-01-04 | Halliburton Energy Services, Inc. | Piping with integral force absorbing restraining system |
US7066265B2 (en) * | 2003-09-24 | 2006-06-27 | Halliburton Energy Services, Inc. | System and method of production enhancement and completion of a well |
US7445045B2 (en) * | 2003-12-04 | 2008-11-04 | Halliburton Energy Services, Inc. | Method of optimizing production of gas from vertical wells in coal seams |
US6978211B2 (en) * | 2003-12-08 | 2005-12-20 | Halliburton Energy Services, Inc. | Methods and systems for using wavelet analysis in subterranean applications |
US20050161081A1 (en) * | 2004-01-22 | 2005-07-28 | Halliburton Energy Services | System and method for treating a fluid in a pipe |
US20080110622A1 (en) * | 2004-03-24 | 2008-05-15 | Willett Ronald M | Methods of Isolating Hydrajet Stimulated Zones |
US7225869B2 (en) * | 2004-03-24 | 2007-06-05 | Halliburton Energy Services, Inc. | Methods of isolating hydrajet stimulated zones |
US7150327B2 (en) * | 2004-04-07 | 2006-12-19 | Halliburton Energy Services, Inc. | Workover unit and method of utilizing same |
US7234529B2 (en) * | 2004-04-07 | 2007-06-26 | Halliburton Energy Services, Inc. | Flow switchable check valve and method |
US7503404B2 (en) * | 2004-04-14 | 2009-03-17 | Halliburton Energy Services, Inc, | Methods of well stimulation during drilling operations |
US7287592B2 (en) * | 2004-06-11 | 2007-10-30 | Halliburton Energy Services, Inc. | Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool |
US7273313B2 (en) * | 2004-06-17 | 2007-09-25 | Halliburton Energy Services, Inc. | Mixing device for mixing bulk and liquid material |
US7243723B2 (en) * | 2004-06-18 | 2007-07-17 | Halliburton Energy Services, Inc. | System and method for fracturing and gravel packing a borehole |
US7370701B2 (en) * | 2004-06-30 | 2008-05-13 | Halliburton Energy Services, Inc. | Wellbore completion design to naturally separate water and solids from oil and gas |
US7429332B2 (en) * | 2004-06-30 | 2008-09-30 | Halliburton Energy Services, Inc. | Separating constituents of a fluid mixture |
US7090153B2 (en) * | 2004-07-29 | 2006-08-15 | Halliburton Energy Services, Inc. | Flow conditioning system and method for fluid jetting tools |
US7543635B2 (en) * | 2004-11-12 | 2009-06-09 | Halliburton Energy Services, Inc. | Fracture characterization using reservoir monitoring devices |
US20060102343A1 (en) * | 2004-11-12 | 2006-05-18 | Skinner Neal G | Drilling, perforating and formation analysis |
US7237612B2 (en) * | 2004-11-17 | 2007-07-03 | Halliburton Energy Services, Inc. | Methods of initiating a fracture tip screenout |
US7398825B2 (en) * | 2004-12-03 | 2008-07-15 | Halliburton Energy Services, Inc. | Methods of controlling sand and water production in subterranean zones |
US20060155473A1 (en) * | 2005-01-08 | 2006-07-13 | Halliburton Energy Services, Inc. | Method and system for determining formation properties based on fracture treatment |
US7506689B2 (en) * | 2005-02-22 | 2009-03-24 | Halliburton Energy Services, Inc. | Fracturing fluids comprising degradable diverting agents and methods of use in subterranean formations |
US20060201674A1 (en) * | 2005-03-10 | 2006-09-14 | Halliburton Energy Services, Inc. | Methods of treating subterranean formations using low-temperature fluids |
US7431090B2 (en) * | 2005-06-22 | 2008-10-07 | Halliburton Energy Services, Inc. | Methods and apparatus for multiple fracturing of subterranean formations |
US7343975B2 (en) * | 2005-09-06 | 2008-03-18 | Halliburton Energy Services, Inc. | Method for stimulating a well |
US7337844B2 (en) * | 2006-05-09 | 2008-03-04 | Halliburton Energy Services, Inc. | Perforating and fracturing |
US20070272407A1 (en) * | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
US7520327B2 (en) * | 2006-07-20 | 2009-04-21 | Halliburton Energy Services, Inc. | Methods and materials for subterranean fluid forming barriers in materials surrounding wells |
US7571766B2 (en) * | 2006-09-29 | 2009-08-11 | Halliburton Energy Services, Inc. | Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage |
US20080083538A1 (en) * | 2006-10-06 | 2008-04-10 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
US7549320B2 (en) * | 2007-01-11 | 2009-06-23 | Halliburton Energy Services, Inc. | Measuring cement properties |
US7580796B2 (en) * | 2007-07-31 | 2009-08-25 | Halliburton Energy Services, Inc. | Methods and systems for evaluating and treating previously-fractured subterranean formations |
US7552648B2 (en) * | 2007-09-28 | 2009-06-30 | Halliburton Energy Services, Inc. | Measuring mechanical properties |
US20090084189A1 (en) * | 2007-09-28 | 2009-04-02 | Halliburton Energy Services, Inc. | Measuring mechanical properties |
US20090125280A1 (en) * | 2007-11-13 | 2009-05-14 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7530396B1 (en) * | 2008-01-24 | 2009-05-12 | Halliburton Energy Services, Inc. | Self repairing cement compositions and methods of using same |
US20100326659A1 (en) * | 2009-06-29 | 2010-12-30 | Schultz Roger L | Wellbore laser operations |
Cited By (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8757259B2 (en) | 2006-12-08 | 2014-06-24 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable channelant fill |
US20110114313A1 (en) * | 2006-12-08 | 2011-05-19 | Timothy Lesko | Heterogeneous proppant placement in a fracture with removable channelant fill |
US10030495B2 (en) | 2006-12-08 | 2018-07-24 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable extrametrical material fill |
US9670764B2 (en) | 2006-12-08 | 2017-06-06 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable channelant fill |
US20110083849A1 (en) * | 2006-12-08 | 2011-04-14 | Oleg Medvedev | Heterogeneous proppant placement in a fracture with removable channelant fill |
US9085727B2 (en) | 2006-12-08 | 2015-07-21 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable extrametrical material fill |
US8763699B2 (en) | 2006-12-08 | 2014-07-01 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable channelant fill |
US9284783B1 (en) | 2008-08-20 | 2016-03-15 | Foro Energy, Inc. | High power laser energy distribution patterns, apparatus and methods for creating wells |
US9562395B2 (en) | 2008-08-20 | 2017-02-07 | Foro Energy, Inc. | High power laser-mechanical drilling bit and methods of use |
US8662160B2 (en) | 2008-08-20 | 2014-03-04 | Foro Energy Inc. | Systems and conveyance structures for high power long distance laser transmission |
US8701794B2 (en) | 2008-08-20 | 2014-04-22 | Foro Energy, Inc. | High power laser perforating tools and systems |
US11060378B2 (en) * | 2008-08-20 | 2021-07-13 | Foro Energy, Inc. | High power laser flow assurance systems, tools and methods |
US8757292B2 (en) | 2008-08-20 | 2014-06-24 | Foro Energy, Inc. | Methods for enhancing the efficiency of creating a borehole using high power laser systems |
US10301912B2 (en) * | 2008-08-20 | 2019-05-28 | Foro Energy, Inc. | High power laser flow assurance systems, tools and methods |
US10036232B2 (en) | 2008-08-20 | 2018-07-31 | Foro Energy | Systems and conveyance structures for high power long distance laser transmission |
US8820434B2 (en) | 2008-08-20 | 2014-09-02 | Foro Energy, Inc. | Apparatus for advancing a wellbore using high power laser energy |
US8826973B2 (en) | 2008-08-20 | 2014-09-09 | Foro Energy, Inc. | Method and system for advancement of a borehole using a high power laser |
US8869914B2 (en) | 2008-08-20 | 2014-10-28 | Foro Energy, Inc. | High power laser workover and completion tools and systems |
US9719302B2 (en) * | 2008-08-20 | 2017-08-01 | Foro Energy, Inc. | High power laser perforating and laser fracturing tools and methods of use |
US8936108B2 (en) | 2008-08-20 | 2015-01-20 | Foro Energy, Inc. | High power laser downhole cutting tools and systems |
US8997894B2 (en) | 2008-08-20 | 2015-04-07 | Foro Energy, Inc. | Method and apparatus for delivering high power laser energy over long distances |
US9027668B2 (en) | 2008-08-20 | 2015-05-12 | Foro Energy, Inc. | Control system for high power laser drilling workover and completion unit |
US9669492B2 (en) | 2008-08-20 | 2017-06-06 | Foro Energy, Inc. | High power laser offshore decommissioning tool, system and methods of use |
US8424617B2 (en) | 2008-08-20 | 2013-04-23 | Foro Energy Inc. | Methods and apparatus for delivering high power laser energy to a surface |
US20130228372A1 (en) * | 2008-08-20 | 2013-09-05 | Foro Energy Inc. | High power laser perforating and laser fracturing tools and methods of use |
US9089928B2 (en) | 2008-08-20 | 2015-07-28 | Foro Energy, Inc. | Laser systems and methods for the removal of structures |
US9664012B2 (en) | 2008-08-20 | 2017-05-30 | Foro Energy, Inc. | High power laser decomissioning of multistring and damaged wells |
US8636085B2 (en) | 2008-08-20 | 2014-01-28 | Foro Energy, Inc. | Methods and apparatus for removal and control of material in laser drilling of a borehole |
US9360631B2 (en) | 2008-08-20 | 2016-06-07 | Foro Energy, Inc. | Optics assembly for high power laser tools |
US9267330B2 (en) | 2008-08-20 | 2016-02-23 | Foro Energy, Inc. | Long distance high power optical laser fiber break detection and continuity monitoring systems and methods |
US8511401B2 (en) | 2008-08-20 | 2013-08-20 | Foro Energy, Inc. | Method and apparatus for delivering high power laser energy over long distances |
US9347271B2 (en) | 2008-10-17 | 2016-05-24 | Foro Energy, Inc. | Optical fiber cable for transmission of high power laser energy over great distances |
US9244235B2 (en) | 2008-10-17 | 2016-01-26 | Foro Energy, Inc. | Systems and assemblies for transferring high power laser energy through a rotating junction |
US9138786B2 (en) | 2008-10-17 | 2015-09-22 | Foro Energy, Inc. | High power laser pipeline tool and methods of use |
US9080425B2 (en) | 2008-10-17 | 2015-07-14 | Foro Energy, Inc. | High power laser photo-conversion assemblies, apparatuses and methods of use |
US9327810B2 (en) | 2008-10-17 | 2016-05-03 | Foro Energy, Inc. | High power laser ROV systems and methods for treating subsea structures |
US8627901B1 (en) | 2009-10-01 | 2014-01-14 | Foro Energy, Inc. | Laser bottom hole assembly |
US8879876B2 (en) | 2010-07-21 | 2014-11-04 | Foro Energy, Inc. | Optical fiber configurations for transmission of laser energy over great distances |
US8571368B2 (en) | 2010-07-21 | 2013-10-29 | Foro Energy, Inc. | Optical fiber configurations for transmission of laser energy over great distances |
US9074422B2 (en) | 2011-02-24 | 2015-07-07 | Foro Energy, Inc. | Electric motor for laser-mechanical drilling |
US9784037B2 (en) | 2011-02-24 | 2017-10-10 | Daryl L. Grubb | Electric motor for laser-mechanical drilling |
US9360643B2 (en) | 2011-06-03 | 2016-06-07 | Foro Energy, Inc. | Rugged passively cooled high power laser fiber optic connectors and methods of use |
WO2013012772A1 (en) * | 2011-07-15 | 2013-01-24 | Schlumberger Canada Limited | Heterogeneous proppant placement in a fracture with removable extrametrical material fill |
CN103781991A (en) * | 2011-07-15 | 2014-05-07 | 普拉德研究及开发股份有限公司 | Heterogeneous proppant placement in a fracture with removable extrametrical material fill |
US9242309B2 (en) | 2012-03-01 | 2016-01-26 | Foro Energy Inc. | Total internal reflection laser tools and methods |
US10815766B2 (en) | 2015-02-27 | 2020-10-27 | Schlumberger Technology Corporation | Vertical drilling and fracturing methodology |
US10221687B2 (en) | 2015-11-26 | 2019-03-05 | Merger Mines Corporation | Method of mining using a laser |
EP3510246A4 (en) * | 2016-09-12 | 2020-03-25 | Services Pétroliers Schlumberger | Wellbore landing methods for reservoir stimulation |
WO2018049368A1 (en) * | 2016-09-12 | 2018-03-15 | Schlumberger Technology Corporation | Wellbore landing methods for reservoir stimulation |
US11840909B2 (en) | 2016-09-12 | 2023-12-12 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
US11466549B2 (en) * | 2017-01-04 | 2022-10-11 | Schlumberger Technology Corporation | Reservoir stimulation comprising hydraulic fracturing through extended tunnels |
US11486214B2 (en) | 2017-07-10 | 2022-11-01 | Schlumberger Technology Corporation | Controlled release of hose |
US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
WO2019168885A1 (en) * | 2018-02-27 | 2019-09-06 | Schlumberger Technology Corporation | Producing disconnected propped fractures |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
US11643914B2 (en) | 2020-05-19 | 2023-05-09 | Saudi Arabian Oil Company | Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery |
US11448054B2 (en) | 2020-05-19 | 2022-09-20 | Saudi Arabian Oil Company | Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery |
US11846166B2 (en) | 2020-05-19 | 2023-12-19 | Saudi Arabian Oil Company | Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery |
US11851989B2 (en) | 2021-12-03 | 2023-12-26 | Saudi Arabian Oil Company | Cooling methodology to improve hydraulic fracturing efficiency and reduce breakdown pressure |
US20240052735A1 (en) * | 2022-08-10 | 2024-02-15 | Saudi Arabian Oil Company | Method of increasing hydrocarbon recovery from a wellbore penetrating a tight hydrocarbon formation by a hydro-jetting tool that jets a thermally controlled fluid |
Also Published As
Publication number | Publication date |
---|---|
WO2011032083A1 (en) | 2011-03-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20110061869A1 (en) | Formation of Fractures Within Horizontal Well | |
CA2611928C (en) | Methods and apparatus for multiple fracturing of subterranean formations | |
US5765642A (en) | Subterranean formation fracturing methods | |
US4951751A (en) | Diverting technique to stage fracturing treatments in horizontal wellbores | |
RU2375561C2 (en) | Method of well completion in underground formation (versions) | |
US7287592B2 (en) | Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool | |
US20050263284A1 (en) | Hydrajet perforation and fracturing tool | |
US6446727B1 (en) | Process for hydraulically fracturing oil and gas wells | |
US20090178801A1 (en) | Methods for injecting a consolidation fluid into a wellbore at a subterranian location | |
CA2650632A1 (en) | Perforating and fracturing | |
CA2802674C (en) | Fracturing method to reduce tortuosity | |
BR112014002812B1 (en) | METHOD FOR FRACTURING MULTIPLE ZONES WITHIN A WELL HOLE FORMED IN AN UNDERGROUND FORMATION | |
US11643914B2 (en) | Integrated methods for reducing formation breakdown pressures to enhance petroleum recovery | |
RU2591999C1 (en) | Orientation method of hydraulic fracturing cracks in underground formation, developed by horizontal shafts | |
US20080210427A1 (en) | Methods Using Fluid Stream for Selective Stimulation of Reservoir Layers | |
US20210131242A1 (en) | Reservoir stimulation comprising hydraulic fracturing through extnded tunnels | |
US6135205A (en) | Apparatus for and method of hydraulic fracturing utilizing controlled azumith perforating | |
RU2176021C2 (en) | Method of forming directed vertical or horizontal fracture in formation fracturing | |
RU187392U1 (en) | The arrangement of underground equipment for hydraulic fracturing | |
RU2178071C1 (en) | Method of formation hydraulic fracturing from cased well and device for method embodiment | |
US20240052735A1 (en) | Method of increasing hydrocarbon recovery from a wellbore penetrating a tight hydrocarbon formation by a hydro-jetting tool that jets a thermally controlled fluid | |
US10508527B2 (en) | Method for creating multi-directional Bernoulli-induced fractures with vertical mini-holes in deviated wellbores | |
RU2177541C2 (en) | Method of directional hydraulic fracturing of formation | |
US20160290112A1 (en) | Processes for hydraulic fracturing | |
Carpenter | New Stimulation Method Significantly Improves Hydrocarbon Recovery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HALLIBURTON ENERGY SERVICES, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SOLIMAN, MOHAMED Y.;MEADOWS, DAVID;REEL/FRAME:025112/0047 Effective date: 20100624 |
|
AS | Assignment |
Owner name: SAUDI ARABIAN OIL COMPANY, SAUDI ARABIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ABASS, HAZIM H.;TAHINI, ASHRAF M.;SIGNING DATES FROM 20100927 TO 20101013;REEL/FRAME:025159/0677 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION |